煤炭工程 ›› 2022, Vol. 54 ›› Issue (11): 94-100.doi: 10.11799/ce202211018

• 生产技术 • 上一篇    下一篇

深部工作面底板太灰水可疏放性评价及防治措施

高家平,祝汉京,朱术云,杨培   

  1. 1. 河南能源化工集团有限公司能源事业部
    2. 永煤集团新桥煤矿
    3. 中国矿业大学资源与地球科学学院
  • 收稿日期:2022-06-06 修回日期:2022-07-24 出版日期:2022-11-15 发布日期:2023-03-09
  • 通讯作者: 朱术云 E-mail:shyzhuqiao@163.com

Study on the feasibility of drainage and decreasing water and prevention for the aquifer of limestone in upper part of Taiyuan Formation in the first working face of deep mining area

  • Received:2022-06-06 Revised:2022-07-24 Online:2022-11-15 Published:2023-03-09

摘要: 为了探究顺和煤矿深部一采区首采面底部太原组上段灰岩含水层是否具有疏放性,在系统分析首采面2401工作面地质、水文地质及开采条件基础上,提出了采用疏水降压可疏放性方式对该工作面底板太灰水进行防治的新思路。为此,设计实施了3个放水孔和2个监测孔的井下群孔放水试验,采用降深-时间配线法和直线图解法对放水阶段与水位恢复阶段采集的相关数据进行了比配和计算,综合获得了该含水层的水文地质参数,相对误差基本满足实际需要。基于放水试验结果,分析确定了首采面底部太原组上段灰岩含水层具有可疏降性。设计了两种疏降方案,进行了8个放水孔与4个监测孔的钻孔设计。通过2401工作面运输巷道施工的7个实际疏放水孔验证,发现水压下降比较明显,疏降效果达到预期目标,结果表明了该工作面底部太原组上段灰岩含水层具有可疏放性。研究方法和思路对类似地质及开采条件下的其它工作面底部灰岩水防治具有很好的参考价值。

关键词: 底板含水层, 灰岩含水层, 首采面, 疏水降压, 水文地质参数

Abstract: In order to study the feasibility of drainage and decreasing water for aquifer of the upper limestone of Taiyuan Formation at the bottom of the first mining face in the deep mining area in Shunhe Coal Mine, based on the systematic analysis of the geology, hydrogeology and mining conditions of the first working face 2401, a new idea is put forward to prevent and control the limestone water in the bottom floor of the first working face by means of drainage and reduction water pressure. Therefore, the design implementation of the three drainage bore hole and two monitoring of underground drainage water test, the draw down water - time matching method and the line graphic method were used to match and calculate for drainage water phase and water level recovery phase , integrated to obtain the hydrogeological parameters of aquifer, the relative error basic meets the actual needs. Based on the results of drainage test, it is determined that the aquifer of the upper limestone of Taiyuan Formation at the bottom of the first wording face can be drained and lowered. Two kinds of drainage water schemes were designed and 8 drainage holes and 4 monitoring holes were designed. Through the verification of 7 actual drainage holes in the the transport roadway of 2401 working face, it was found that the water pressure drops obviously, and the drainage effect reaches the expected target. The results show that the aquifer of the upper limestone of Taiyuan Formation at the bottom of the working face has the ability of drainage. The research methods and ideas have a good reference value for the control of limestone water at the bottom of other working face under similar geological and mining conditions.