煤炭工程 ›› 2022, Vol. 54 ›› Issue (12): 115-120.doi: 10.11799/ce202212021

• 研究探讨 • 上一篇    下一篇

盘区辅助回风巷护巷煤柱宽度尺寸研究

张海荣,杨娟娟,雷薪雍,李艳军   

  1. 榆林职业技术学院
  • 收稿日期:2022-09-02 修回日期:2022-11-22 出版日期:2022-12-14 发布日期:2023-02-06
  • 通讯作者: 张海荣 E-mail:153661176@qq.com

Study on the Width of Coal Pillar in Panel Auxiliary Air Return Roadway

  • Received:2022-09-02 Revised:2022-11-22 Online:2022-12-14 Published:2023-02-06

摘要: 为了保证神树畔煤矿31盘区辅助回风巷的安全施工,在总结31104工作面矿压监测数据的基础上,采用煤柱载荷估算和极限平衡区理论计算出护巷煤柱尺寸合理范围|综合实测分析和理论计算取值后,以煤层地质条件和巷道布置为背景,通过数值模拟10m、15m、20m、25m护巷煤柱条件下护巷煤柱内部得应力和变形规律,研究结果表明:31盘区辅助回风巷受一侧采动影响后,按20m留设护巷煤柱可以满足生产需要。

关键词: 特厚煤层, 沿空掘巷, 护巷煤柱, 煤柱宽度

Abstract: Abstract:At the initial stage of the design of Shenshupan Coal Mine, the panel air return roadway was not designed. During the mining of Panel 31, the main air return roadway was also used as the panel air return roadway, which easily led to the wind speed exceeding the limit. In order to meet the needs of ventilation, ensure the safe production of the coal mine, and solve the hidden danger that the return air in the south wing of Panel 31 exceeds the limit, it is decided to construct a panel auxiliary return air roadway 20m outside the goaf in the north wing of Panel 31. Therefore, on the basis of summarizing the ground pressure monitoring data of 31104 working face in Shenshupan Coal Mine, the reasonable size range of coal pillar for roadway protection is calculated by using coal pillar load estimation and limit equilibrium zone theory; After comprehensive actual measurement analysis and theoretical calculation, taking the geological conditions of coal seams and roadway layout as the background, through numerical simulation of the internal stress and deformation laws of roadway protection coal pillars under the conditions of 10m, 15m, 20m and 25m roadway protection coal pillars, the research results show that: under the influence of mining on one side, 20m roadway protection coal pillars can meet the production needs.