煤炭工程 ›› 2024, Vol. 56 ›› Issue (2): 105-113.doi: 10.11799/ce202402016

• 研究探讨 • 上一篇    下一篇

切顶沿空留巷卸压机理及支护技术研究

孙利辉,纪权财,王中海,等   

  1. 1. 河北工程大学资源学院
    2. 河北工程大学矿业与测绘工程学院
    3. 河北冀中邯峰矿业有限公司武安云驾岭矿
    4. 冀中能源邯郸矿业集团云驾岭煤矿
  • 收稿日期:2023-08-22 修回日期:2023-10-23 出版日期:2024-02-20 发布日期:2024-02-29
  • 通讯作者: 纪权财 E-mail:452794355@qq.com

Research on pressure relief mechanism and support technology of thick and hard immediate roof cutting gob-side entry retaining

  • Received:2023-08-22 Revised:2023-10-23 Online:2024-02-20 Published:2024-02-29

摘要: 云驾岭矿9 号煤上覆厚硬岩层, 采场矿压显现强烈, 采用传统的沿空留巷方法围岩控制难度大。以云驾岭矿19103 工作面运巷为背景, 分析了切顶沿空留巷厚硬直接顶力学平衡条件,得出巷旁需提供不小于1046 kN 的支护阻力。采用数值模拟的方法对比了沿空留巷在厚硬直接顶条件下切顶与不切顶时围岩变形及应力、塑性区的分布规律, 结果表明: 切顶后采空区顶板更容易垮落, 留巷顶板稳定时下沉量仅为同期不切顶时的28. 2%, 切顶后留巷侧顶板垂直应力变小、水平应力增大且围岩塑性区向顶底板深部转移, 揭示了预裂切顶卸压的机理为阻断工作面动压的传递以及诱导采空区顶板提前冒落接顶承压, 水平应力增大的原因为切缝两侧形成的长、短“悬臂梁” 变形的结果。提出了针对厚硬直接顶切顶留巷的顶板控制理念为集中支护切缝端、适当让压和形成“组合悬臂梁”, 采用了“长、短锚索+单体液压支柱+可缩性U 钢梁” 的综合支护技术及挂网喷浆的密闭措施。现场工业性试验效果良好, 切顶后留巷顶板锚索受力峰值在350 kN 左右, 围岩稳定后巷道规格满足二次复用的条件。

关键词: 沿空留巷, 预切顶, 厚硬直接顶, 卸压机理, 长“悬臂梁”

Abstract: The No.9 coal seam of Yunjialing Mine is overlying thick and hard rock strata, and the mine pressure in the stope is strong. It is difficult to control the surrounding rock by using the traditional gob-side entry retaining method. Based on the transportation roadway of 19103 working face in Yunjialing Mine, the mechanical equilibrium conditions of thick and hard immediate roof of gob-side entry retaining with roof cutting are analyzed, and it is concluded that the support resistance of no less than 1046kN should be provided beside the roadway. The numerical simulation method was used to compare the deformation and stress of surrounding rock and the distribution of plastic zone of gob-side entry retaining with and without roof cutting under the condition of thick and hard direct roof. The results show that the roof of goaf is more likely to collapse after roof cutting. The subsidence of the roof of the retaining roadway is only 28.2 % of that without roof cutting in the same period. After roof cutting, the vertical stress of the roof on the side of the retaining roadway becomes smaller, the horizontal stress increases and the plastic zone of the surrounding rock transfers to the deep part of the roof and floor. It is revealed that the mechanism of pre-splitting roof cutting pressure relief is to block the transmission of dynamic pressure in the working face and induce the roof of the goaf to fall in ad-vance to meet the roof pressure. The reason for the increase of horizontal stress is the result of the deformation of the long and short ' cantilever beam ' formed on both sides of the slit. The roof control idea for gob-side entry retaining with thick and hard immediate roof is proposed as centralized support of the cutting end, appropriate pressure relief and formation of “combined can-tilever beam”. The comprehensive support technology of long and short anchor cable, single hydraulic prop and yielding U steel beam is adopted, and the sealing measures of hanging net shotcrete are adopted. The field industrial test results are good, the peak stress of the anchor cable of the roadway roof after cutting the roof is about 350kN, the roadway section is 2.95m×2.44m (width × height) after the surrounding rock is stable, and the specifications meet the conditions of secondary reuse. The technology has been successfully applied in the subsequent No.9 coal face in Yunjialing Mine.

中图分类号: