煤炭工程 ›› 2026, Vol. 58 ›› Issue (4): 82-87.doi: 10.11799/ce202604011

• 生产技术 • 上一篇    下一篇

深部特厚煤层综放工作面末采区域冲击危险性分析及防治技术研究

马文涛   

  1. 中煤科工开采研究院有限公司,北京 100013

  • 收稿日期:2025-05-26 修回日期:2025-06-18 出版日期:2026-04-10 发布日期:2026-05-12
  • 通讯作者: 马文涛 E-mail:1412225958@qq.com

Rock burst risk analysis and prevention in the final mining zone of a fully mechanized top coal caving face in a deep extra-thick coal seam #br#

  • Received:2025-05-26 Revised:2025-06-18 Online:2026-04-10 Published:2026-05-12

摘要:

工作面回采末期,集中布置的巷道群区域应力高度集中,具有较高的冲击风险。针对工作面回采末期冲击地压防治难题,以文家坡煤矿4105工作面为例,通过微震、地音、应力监测系统分析了末采区域的冲击危险性,并进一步分析了冲击致灾因素, 提出对诱发冲击启动的动静载荷源进行分源防控技术方案,对顶板采取爆破预裂, 对煤层采取大直径钻孔卸压,并进行了工程实践与效果检验。现场应用表明, 微震活动表现为高频次、低能量状态,日释放能量降幅达82.5%,地音cd预警频次占比下降32%,煤体应力集中程度有所缓解,应用效果良好,有效降低了末采区域的冲击危险性。

关键词:

回采末期, 巷道群, 厚硬顶板, 动静载叠加, 冲击地压

Abstract:

At the end of mining, the stress in the concentrated roadway group is highly concentrated, which has a high impact risk. In view of the difficult problem of rock burst prevention and control at the end of mining in the working face, taking the 4105 working face of wenjiapo coal mine as an example, the impact risk of the final mining area is analyzed through the micro earthquake, ground sound and stress monitoring system, and the impact disaster causing factors are further analyzed. The technical scheme of separate source prevention and control of the dynamic and static load source inducing the impact start is put forward, the blasting pre splitting is adopted for the roof, and the large-diameter drilling is adopted for pressure relief in the coal seam, The engineering practice and effect test are carried out. The field application shows that the microseismic activity is in the state of "high frequency and low energy", the daily released energy decreases by 82.5%, the proportion of geoacoustic C and D early warning shifts decreases by 32%, the stress concentration degree of coal body is relieved, the application effect is good, and the impact risk in the final mining area is effectively reduced.

中图分类号: