Design and Construction on Large segment Section Face Pre-Grouting and Water Prevention and Control for Water-blocking in the Main Shaft bedrock segment of Shunhe Mine
[1] 李尉进,陆志东,尹若庆.白象山铁矿副井井筒主含水层工作面注浆堵水实践[J].建井技术,2010(6):6-8.
Li Wei-Jin,Lu Zhi-dong,Yin Ruo-qin.Baixiangshan Mine Shaft in the main aquifer face pre-grouting practice [J].Construction Technology,2010(6):6-8.
[2] 成明奇,万援朝.釜山风井工作面预注浆施工技术及经验[J].煤炭科技,2007(3):47-49.
Cheng Ming-qi,Wan Yuan-chao.Fusan air Shaft face pre-grouting technology and experience[J].Coal Science and Technology,2007(3):47-49.
[3] 徐波,王世华,胡荣顶.千米立井富含水复杂地层大段高注浆技术[J].建井技术,2010,31(5):17-20.
Xu Bo,Wang Shi-hua,Hu Rong-ding.One thousand meters shaft water-rich complex formation Large segment of high grouting technology [J].Construction Technology,2010,31(5):17-20.
[4] 崔云龙.简明建井工程手册[M].北京:煤炭工业出版社,2000.
[5] 李红辉,权勇.措施竖井工作面预注浆施工技术及经验[J].金属矿山,2009(11):386-388.
Li Hong-hui,Quan Yong.The measures - shaft pre-grouting construction skills and experience[J].Metal Mine,2009(11):386-388.
[6] 中国煤炭建设协会.煤矿井巷工程施工规范[M].北京:中国计划出版社,2010.
[7] 徐金根,陆云,王君毅.郑家庄煤矿主井井筒工作面预注浆技术[J].建井技术,2006,27(5):19-20.
Xu Jin-geng,Lu Yun,Wang Jun-yi.Zhengjiazhuang Mine main shaft face pregrouting technology[J].Construction Technology,2006,27(5):19-20.
[8] 李红,贾书祥,王松江.新义煤矿主井井筒工作面预注浆施工[J].建井技术,2008,29(2):14-15.
Li Hong,Jia Shu-xiang,Wang Song-jiang.Xinyi Mine main shaft face Pre-grouting[J].Construction Technology,2008,29(2):14-15.
[9] 洪黎明,李飞越.薛湖煤矿主井井筒工作面预注浆施工[J].建井技术,2008,29(2):18-20.
Hong Li-ming,Li Fei-yue.Xuehu Mine main shaft face Pre-grouting[J].Construction Technology,2008,29(2):18-20.