摘要: 预应力锚固技术在煤矿巷道顶板支护中被广泛应用,但目前针对预应力锚索锚固结构的卸锚仍采用手工操作,缺乏安全成熟的研究和成果。本研究分析了锚环-夹片-锚索三者之间物质-场关系,确定了传统矿用锚具卸锚过程中的关键问题,通过消除非有效完整功能的物质-场模型、减缓有害功能的物质-场模型等两个方面进行分析,借助实验室试验对其进行结构优化。最终提出一种可拆卸矿用锚具,并在井下进行了应用试验。试验结果表明,相较于目前常用的矿用锚具,论文提出的可拆卸矿用锚具在实现快速高效拆除的同时,所需拆卸力小,锚索剩余应力实现归零,卸锚过程安全可靠。

关键词: 预应力锚固技术, 预应力支护锚索, 矿用锚具, 锚具拆卸, 物质-场分析

Abstract: Prestressed anchoring technology is widely used in coal mine roadway roof support, but at present, the disassembly of mine anchors is still carried out manually. In the process of disassembly, the disassembly load is high, and the remaining load of anchor cable after disassembly is not zero, so the safety of the disassembly process is poor, and the subsequent operation has security risks. This paper takes B-type mine anchorage as the research object, establishes the sub-field model during its disassembly, analyzes and determines its key problems, and carries out the structural improvement design of mine anchorage based on the sub-field model transformation method, and carries out the structural optimization with the assistance of the unloading experiment. Finally, an improved detachable mine anchor is proposed and tested in underground. The test results show that, compared with the commonly used mine anchors, the proposed demountable mine anchors after structural optimization can achieve rapid and efficient removal, and at the same time, the removal force of the anchors is small, the residual stress of the anchor cable is zero, and the unloading process is safe and reliable.