煤炭工程 ›› 2026, Vol. 58 ›› Issue (6): 21-28.doi: 10.11799/ce202606004

• 设计技术 • 上一篇    下一篇

红沙泉露天煤矿首采区工作线长度及东端帮压帮内排方式研究

冯勇强,胡德昊,洪常鑫,马 力,刘冰烊,杨 杰   

  1. 1. 国能新疆红沙泉能源有限责任公司,新疆 乌鲁木齐 830000

    2. 西安科技大学 能源与矿业工程学院,陕西 西安 710054

  • 收稿日期:2025-02-17 修回日期:2025-03-19 出版日期:2026-06-15 发布日期:2026-06-24
  • 通讯作者: 马力 E-mail:mali217@xust.edu.cn

Study on working face length and east end-wall push-back internal dumping method in the first mining area of Hongshaquan Open-pit Coal Mine #br#

  • Received:2025-02-17 Revised:2025-03-19 Online:2026-06-15 Published:2026-06-24

摘要:

针对红沙泉露天矿首采区由于筛分场位置因素导致东西帮境界出现弯折的问题,在筛分场即将拆除、西帮靠界且排土工作线将覆盖东帮“U”形弯的前提下,对首采区在筛分场拆除后工作线长度进行了优化,采用理论计算和模型验证的方法,分别计算了经济合理工作线长度、技术可行的工作线长度,得出了在该露天煤矿的目标产能下的工作线长度为2800m左右,并通过工程位置推演验证了可行性。基于红沙泉露天矿现场实际情况,构建基于总费用最小的压帮内排方式关系模型,计算了不同压帮高度下的二次剥离与转排费用。研究表明:随着留沟深度的不断增加,压帮所花费的总费用不断增加,以压帮所花费总费用最小为原则,最终确定采用全压帮内排方式。

关键词:

露天煤矿, 不规则境界, 工作线长度优化, 压帮内排方式

Abstract:

In response to the issue of the east and west boundaries of the first mining area of the Hongshaquan open-pit mine being bent due to the location of the screening plant, when the screening plant is about to be dismantled, the west boundary is about to reach the limit, and the waste rock dumping line will cover the "U"-shaped bend of the east boundary, the length of the working line of the first mining area after the dismantling of the screening plant was optimized. The economic and reasonable working line length and the technically feasible working line length were calculated respectively by theoretical calculation and model verification methods. It was concluded that the working line length of the open-pit coal mine under the target production capacity is about 2800 m, and the feasibility was verified through engineering position deduction. Based on the actual situation of the Hongshaquan open-pit mine, a relationship model of the in-pit dumping method within the pressure bank based on the minimum total cost was constructed, and the secondary stripping and transfer-dumping costs under different pressure bank heights were calculated. The research shows that as the pressure bank height increases continuously, the total cost of the pressure bank also increases continuously. Based on the principle of minimizing the total cost of the pressure bank, the full pressure bank in-pit dumping method was finally determined.

中图分类号: