煤炭工程 ›› 2022, Vol. 54 ›› Issue (2): 19-24.doi: 10.11799/ce202202004

• 设计技术 • 上一篇    下一篇

特厚煤层综放开采沿空掘巷煤柱合理宽度研究

郭重托1,李杰2,张伟光2   

  1. 1. 伊犁永宁煤业化工有限公司
    2. 新疆工程学院
  • 收稿日期:2021-09-07 修回日期:2021-10-31 出版日期:2022-02-14 发布日期:2022-07-06
  • 通讯作者: 李杰 E-mail:390503510@qq.com

Researching of enlarging anchorage parameters and ways under the end of the bolt hole in the soft-rock roadway

,LI JieJie,   

  • Received:2021-09-07 Revised:2021-10-31 Online:2022-02-14 Published:2022-07-06
  • Contact: LI JieJie E-mail:390503510@qq.com

摘要: 针对特厚煤层综放开采沿空掘巷时宽煤柱护巷效果不佳,煤壁片帮、围岩变形量大、煤炭资源浪费严重等现状。以伊犁潘津工业煤矿2302工作面回风巷为工程背景,基于极限平衡理论探究了侧压系数、采高、埋深及煤柱支护阻力等因素对窄煤柱宽度的影响规律。结果表明,随着前三者逐渐增大,煤柱宽度也随之增大,后者反之|煤柱合理宽度取值范围的上下极限差值也随之增大,而后者几乎不发生变化。此外,结合现场地质条件,确定了窄煤柱宽度为6m,同时采用数值计算验证了其合理性,并在2302工作面回风巷进行了工业性试验。现场结果表明,6m窄煤柱在沿空掘巷期间,巷道断面开拓轮廓无明显变形,围岩控制效果显著。

关键词: 特厚煤层, 沿空掘巷, 小煤柱, 数值模拟

Abstract: Aiming at the present situation of roadway protection effect of wide coal pillar, large deformation of coal wall wall and surrounding rock, and serious waste of coal resources when driving along goaf in fully mechanized caving of extra-thick coal seam, etc. Taking 2302 working face track passage of Panjin Coal Mine in Yili as engineering background, a mechanical model of narrow coal pillar was established based on limit equilibrium theory, and the influence laws of lateral pressure coefficient, mining height, buried depth and support resistance of coal pillar on the width of narrow coal pillar were investigated. The results show that the width of coal pillar increases with the increase of the first three pillars, and vice versa. The difference between the upper limit and lower limit of the reasonable width range of coal pillar also increases, while the latter hardly changes. In addition, combined with the geological conditions, the width of the narrow coal pillar is determined to be 6m, and its rationality is verified by numerical calculation, and the industrial test is carried out on the track passage of 2302 working face. The field practice results show that during the period of 6m narrow coal pillar excavation along the goaf, the roadway section development contour has no obvious deformation, and the surrounding rock control effect is remarkable.

中图分类号: