煤炭工程 ›› 2023, Vol. ›› Issue (12): 0-0.

• 设计技术 •    

房柱式采空区影响的浅埋深近距离煤层群开采技术

开采研究院1,高超2   

  1. 1. 开采研究院
    2. 天地科技股份有限公司
  • 收稿日期:2023-06-12 修回日期:2023-08-27 出版日期:2023-12-20 发布日期:2024-03-11
  • 通讯作者: 高超 E-mail:gaochao@tdkcsj.com

Mining technology of shallow deep coal seam group influenced by house-pillar goaf

  • Received:2023-06-12 Revised:2023-08-27 Online:2023-12-20 Published:2024-03-11

摘要: 房柱式采煤方法对浅部煤层开采后,由于缺乏遗留煤柱尺寸的技术资料,影响着浅埋深近距离煤层群矿井的安全开采。文章基于韩家湾三盘区2-2煤层房采区地质采矿条件,开展了钻探勘察、三维激光扫描、物理力学性质测试、采空区积水探测、理论分析等研究工作。应用“采空区钻探+漏失量观测+空区积水探测+维激光扫描”技术得到三盘区2-2煤房柱式采空区精查区域的顶板裂隙发育程度低、顶板岩层较为完整、煤柱及房仓参数为采7m留8m的采煤方式、部分区域空区积水高度0.15~0.35m;基于实验室测试结果,应用相关理论对2-2煤现状下残留煤柱、1-2煤长壁工作面蹬空扰动2-2煤煤柱的稳定性计算分析。研究表明:三盘区2-2煤不同房柱式开采尺寸的残留煤柱现状下暂时稳定;1-2煤长壁工作面蹬空2-2煤房柱式空区开采的支承压力影响2-2煤残留煤柱不能保持稳定;“先采下组煤层,应用矿山压力对2-2煤残留煤柱破坏后,再实施上组煤蹬空扰动破坏后的房柱式采空区”的开采方案是技术可行的。

关键词: 近距离煤层群, 房柱式采空区, 综合探测, 煤柱稳定性, 蹬空开采, 可行性分析

Abstract: Because of the lack of technical data of the size of remaining coal pillar, safety mining of shallow deep and adjacent coal seam is affected by the house-pillar mining method after mining the shallow seam. Based on the geological and mining conditions of 2-2 coal seam using house-pillar mining method in third panel, Hanjiawan Coal Mine, drilling investigation, 3D laser scanning, physical and mechanical property testing, water detection in goaf, theoretical analysis and other research work have been carried out. Using technology of "goaf drilling+leakage observation+goaf water detection+dimensional laser scanning", it is obtained that roof crack development degree of the goaf column type goaf is low, roof strata are relatively complete, the parameters of coal pillar and warehouse are 7m and 8m respectively, and the height of goaf water in some areas is 0.15~0.35m. Based on laboratory test results, stability of residual coal pillar under the current condition of 2-2 coal and the stability of disturbed 2-2 coal pillar under the push off of 1-2 coal longwall working face are calculated and analyzed by relevant theories. Results show that residual coal pillars of different room and pillar mining sizes of coal 2-2 are temporarily stable under the current situation. The abutment pressure of 1-2 coal longwall face pushing off 2-2 coal room pillar goaf affects 2-2 coal residual pillar can not keep stable; The mining scheme of "mining group coal seam first, using mine pressure to destroy the residual coal pillars of coal 2-2, and then implementing the house-pillar type goaf after the upper group coal push off disturbance destruction" is technically feasible.

Key words: adjacent coal seams, house-pillar goaf, integrated detection, pillar stability, strip-off mining, feasibility analysis