Mining technology of contiguous coal seams influenced by room-pillar goaf#br#

  • Received:2023-06-12 Revised:2023-08-27 Online:2023-12-20 Published:2024-03-11

摘要:

为了实现受房柱式采空区影响的浅埋深、近距离煤层群矿井的安全开采,依据韩家湾三盘区2-2煤层房采区地质采矿条件,采取了“采空区钻探+漏失量观测+空区积水探测+三维激光扫描”综合探测技术,探测结果表明,三盘区2-2煤房柱式采空区精查区域的顶板裂隙发育程度低,顶板岩层较为完整,煤柱及房仓参数为采7m留8m的采煤方式,部分区域采空区积水高度0.15~0.35m。同时基于实验室测试结果,应用相关理论对2-2煤现状下残留煤柱、1-2煤长壁工作面蹬空扰动2-2煤煤柱的稳定性进行了分析,研究表明:三盘区2-2煤不同房柱式开采尺寸的残留煤柱现状下暂时稳定;1-2煤长壁工作面蹬空2-2煤房柱式空区开采的支承压力影响2-2煤残留煤柱不能保持稳定先采下组煤层,利用矿山压力对2-2煤残留煤柱破坏后,再在扰动破坏后的房柱式采空区上实施上组煤蹬空开采”的方案是技术可行的。

关键词: 近距离煤层群, 房柱式采空区, 煤柱稳定性, 蹬空开采

Abstract:

Because of the lack of technical data of the size of remaining coal pillar, safety mining of shallow deep and adjacent coal seam is affected by the house-pillar mining method after mining the shallow seam. Based on the geological and mining conditions of 2-2 coal seam using house-pillar mining method in third panel, Hanjiawan Coal Mine, drilling investigation, 3D laser scanning, physical and mechanical property testing, water detection in goaf, theoretical analysis and other research work have been carried out. Using technology of "goaf drilling+leakage observation+goaf water detection+dimensional laser scanning", it is obtained that roof crack development degree of the goaf column type goaf is low, roof strata are relatively complete, the parameters of coal pillar and warehouse are 7m and 8m respectively, and the height of goaf water in some areas is 0.15~0.35m. Based on laboratory test results, stability of residual coal pillar under the current condition of 2-2 coal and the stability of disturbed 2-2 coal pillar under the push off of 1-2 coal longwall working face are calculated and analyzed by relevant theories. Results show that residual coal pillars of different room and pillar mining sizes of coal 2-2 are temporarily stable under the current situation. The abutment pressure of 1-2 coal longwall face pushing off 2-2 coal room pillar goaf affects 2-2 coal residual pillar can not keep stable; The mining scheme of "mining group coal seam first, using mine pressure to destroy the residual coal pillars of coal 2-2, and then implementing the house-pillar type goaf after the upper group coal push off disturbance destruction" is technically feasible.

中图分类号: