煤炭工程 ›› 2024, Vol. 56 ›› Issue (3): 102-109.doi: 10.11799/ce202403016

• 研究探讨 • 上一篇    下一篇

沿空留巷“内支-外卸”围岩控制技术研究与应用

李明   

  1. 中国矿业大学(北京)
  • 收稿日期:2023-07-31 修回日期:2023-11-05 出版日期:2024-03-20 发布日期:2024-03-25
  • 通讯作者: 李明 E-mail:1847986835@qq.com

Research and application of "internal support-external pressure relief"surrounding rock control technology along the gob-side entry retaining

  • Received:2023-07-31 Revised:2023-11-05 Online:2024-03-20 Published:2024-03-25

摘要: 为解决现场实际中沿空留巷受采动影响围岩变形破环严重问题, 以山西晋城东峰矿为工程背景, 分析了沿空留巷不同阶段覆岩运移规律, 明确了围岩控制的重点。确定了采用“ 内支-外卸” 的协同控制方式, 采用理论分析、现场应用与监测的手段着重对巷旁柔模混凝土支护与顶板超前爆破预裂卸压进行了设计、分析与效果检验。研究结果表明, 沿空留巷巷道在滞后工作面100 m 范围内巷道变形速度较大, 柔模墙体在滞后工作面200 m 范围内压力变化较大并达到最高值,应为维护重点; 现场优化后的巷旁支护体能够满足巷帮的承载能力; 柔模混凝土墙巷旁支护和超前爆破预裂切顶卸压协同发挥作用, 在降低采动应力影响、改善留巷应力环境的同时提高了巷帮的支护强度, 有效地提高了留巷围岩的稳定性。

关键词: 沿空留巷, 覆岩运动, 爆破预裂卸压, 柔模混凝土

Abstract: To solve the serious problem of perimeter rock deformation and ring breaking in the field by mining influence, we take Shanxi Jincheng Coal Mine as the engineering background, analyze the different stages of the overlying rock movement law along the perimeter of the perimeter of the perimeter of the perimeter of the perimeter of the mine, clarify the focus of the control of the perimeter rock, and determine the synergistic control way of "internal support-external pressure relief", and use the theoretical analysis, on-site application and monitoring. Theoretical analysis, field application and monitoring were used to analyze and validate the flexible concrete support next to the lane and the roof plate pre-cracking and pressure relief by over-blasting. The research results show that the deformation speed of the roadway along the hollow stay roadway is larger within 100m of the lagging working face, and the pressure change of the flexible mold wall is larger and reaches the highest value within 200m of the lagging working face, so it should be the key point of maintenance; the optimized roadway support body can meet the bearing capacity of the roadway gangs; the roadway support of the flexible mold concrete wall and the over-the-top pre-cracking cutting and unloading of the roof work synergistically to reduce the impact of mining stress, improve the mining stress, and reduce the impact of the mining stress, improve the mining stress, improve the mining stress, and improve the mining stress of the roof. Mining stress influence, improve the stress environment of the stay lane at the same time improve the support strength of the lane gang support strength, effectively improve the stability of the stay lane perimeter rock.

中图分类号: