| [1] 雷永明. 4306综采面切顶卸压留巷方案优化设计 [J]. 江西煤炭科技, 2024, (02): 54-57.LEI, Yongming. Optimized Design Scheme for Cutting and Unloading Pressure in Roadway Retention for the 4306 Comprehensive Mining Face [J]. Jiangxi Coal Science and Technology, 2024, (02): 54-57.[2] 李奥立, 王沉, 苟仁涛, 等. 坚硬顶板工作面支架前方切顶卸压技术研究 [J]. 矿业研究与开发, 2024, 44(05): 85-91.LI, Aoli; WANG, Chen; GOU, Rentao, et al. Research on Cutting and Unloading Pressure Technology in Front of Supports for Hard Roof Working Faces [J]. Mining Research and Development, 2024, 44(05): 85-91.[3] 王永法. 防隔水煤柱切顶卸压定向爆破参数设计及工程应用 [J]. 煤炭工程, 2024, 56(02): 1-9.WANG, Yongfa. Design of Directional Blasting Parameters for Cutting and Unloading Pressure in Water-Barrier Coal Pillars and Its Engineering Application [J]. Coal Engineering, 2024, 56(02): 1-9.[4] 陈绍杰, 刘江伟, 李亚康, 等. 底板动压巷道压裂弱结构体应力转移控制技术 [J]. 煤炭科学技术, 2024, 52(01): 106-116.CHEN, Shaojie; LIU, Jiangwei; LI, Yakang, et al. Technology for Controlling Stress Transfer in Weak Structural Bodies by Fracturing in Floor Dynamic Pressure Roadways [J]. Coal Science and Technology, 2024, 52(01): 106-116.[5] 吴文达, 王天辰, 柏建彪. 煤柱下综采工作面矿压特征及水力压裂切顶控制 [J].太原理工大学学报, 2023, 54(04): 684-691.WU, Wenda; WANG, Tianchen; BAI, Jianbiao. Characteristics of Mining Pressure and Hydraulic Fracturing Cutting Top Control under Coal Pillar in Comprehensive Mining Working Faces [J]. Journal of Taiyuan University of Technology, 2023, 54(04): 684-691.[6] 张鹏, 巩仲斌, 贺丽峰, 等. 富家凹煤业坚硬顶板巷道水力压裂技术研究 [J]. 煤炭工程, 2023, 55(03): 68-72.ZHANG, Peng; GONG, Zhongbin; HE, Lifeng, et al. Study on Hydraulic Fracturing Technology for Hard Roof Roadways in Fujia Concave Coal Industry [J]. Coal Engineering, 2023, 55(03): 68-72.[7] 郭志飚, 王将, 曹天培, 等. 薄煤层切顶卸压自动成巷关键参数研究 [J]. 中国矿业大学学报, 2016, 45(05): 879-885.GUO, Zhibiao; WANG, Jiang; CAO, Tianpei, et al. Study on Key Parameters for Automatic Roadway Formation by Cutting Top and Unloading Pressure in Thin Coal Seam [J]. Journal of China University of Mining & Technology, 2016, 45(05): 879-885.[8] 孙晓明, 刘鑫, 梁广峰, 等. 薄煤层切顶卸压沿空留巷关键参数研究 [J]. 岩石力学与工程学报, 2014, 33(07): 1449-1456.SUN, Xiaoming; LIU, Xin; LIANG, Guangfeng, et al. Study on Key Parameters for Cutting Top and Unloading Pressure along Empty Roadway in Thin Coal Seam [J]. Chinese Journal of Rock Mechanics and Engineering, 2014, 33(07): 1449-1456.[9] 王巨光, 王刚. 切顶卸压沿空留巷技术探讨 [J]. 煤炭工程, 2012, (01): 24-26.WANG, Juguang; WANG, Gang. Discussion on Cutting Top and Unloading Pressure Technology along Empty Roadway [J]. Coal Engineering, 2012, (01): 24-26.[10] 陈鹏. 高瓦斯矿井综采工作面隅角悬顶处理技术实践 [J]. 能源技术与管理, 2021, 46(05): 37-39.CHEN, Peng. Practice of Corner Hanging Roof Treatment Technology in High Gas Comprehensive Mining Working Faces [J]. Energy Technology and Management, 2021, 46(05): 37-39.[11] 赵艳军. 高瓦斯矿井动压巷道水力切顶卸压技术研究 [J]. 山东煤炭科技, 2022, 40(08): 20-22.ZHAO, Yanjun. Research on Hydraulic Cutting Top and Unloading Pressure Technology in High Gas Mine Dynamic Pressure Roadways [J]. Shandong Coal Science and Technology, 2022, 40(08): 20-22.[12] 翟成, 李贤忠, 李全贵. 煤层脉动水力压裂卸压增透技术研究与应用 [J]. 煤炭学报, 2011, 36(12): 1996-2001.ZHAI, Cheng; LI, Xianzhong; LI, Quangui. Research and Application of Pulsating Hydraulic Fracturing Unloading and Permeability Enhancement Technique in Coal Seam [J]. Journal of China Coal Society, 2011, 36(12): 1996-2001.[13] 刘爱卿. 近距离煤层水力压裂切顶卸压护巷技术研究 [J]. 煤炭工程, 2020, 52(04): 38-42.LIU, Aiqing. Study on Close-Distance Coal Seam Hydraulic Fracturing Cutting Top and Unloading Pressure Protection Technology [J]. Coal Engineering, 2020, 52(04): 38-42.[14] 王耀锋, 何学秋, 王恩元, 等. 水力化煤层增透技术研究进展及发展趋势 [J]. 煤炭学报, 2014, 39(10): 1945-1955.WANG, Yaofeng; HE, Xueqiu; WANG, Enyuan, et al. Progress and Development Trend of Hydraulic Permeability Enhancement Technology in Coal Seam [J]. Journal of China Coal Society, 2014, 39(10): 1945-1955.[15] 孙志勇, 张镇, 王子越, 等. 水力压裂切顶卸压技术在大采高留巷中的应用研究 [J]. 煤炭科学技术, 2019, 47(10): 190-197.SUN, Zhiyong; ZHANG, Zhen; WANG, Ziyue, et al. Application Study of Hydraulic Fracturing Cutting Top and Unloading Pressure Technology in High Extraction Roadway [J]. Coal Science and Technology, 2019, 47(10): 190-197.[16] 闫少宏 宁, 康立军,史元伟,汪有刚,李颖飞. 用水力压裂处理坚硬顶板的机理及实验研究 [J]. 煤炭学报, 2000, (01): 34-37.YAN, Shaohong Ning; KANG, Lijun; SHI, Yuanwei; WANG, Yougang; LI, Yingfei. Mechanism and Experimental Research of Hard Roof Treatment by Hydraulic Fracturing [J]. Journal of China Coal Society, 2000, (01): 34-37.[17] 杜春志. 煤层水压致裂理论及应用研究 [D], 2008.DU, Chunzhi. Study on the Theory and Application of Coal Layer Water Pressure Fracturing [D], 2008.[18] 鲁岩. 构造应力场影响下的巷道围岩稳定性原理及其控制研究 [D], 2008.LU, Yan. Research on the Stability Principle of Roadway Surrounding Rock under the Influence of Structural Stress Field and Its Control [D], 2008.[19] 林健,郭凯,孙志勇,等.强烈动压巷道水力压裂切顶卸压压裂时机研究[J].煤炭学报,2021,46( S1) : 140-148.LIN Jian,GUO Kai,SUN Zhiyong,et al.Study on fracturing timing of hydraulic fracturing top-cutting and pressure relief in roadway with strong dynamic pressure[J].Journal of China Coal Society,2021,46( S1) : 140-148.[20] 孙永新.大埋深综放面侧向覆岩结构有控改造及应用研究[D].2022.SUN Yongxin.Controlled reconstruction and application of lateral overburden structure of fully mechanized caving face with large burial depth[D],2022. |