极近距离煤层群下部煤层回采巷道布置及围岩控制技术研究

孙健新,赵正军   

  1. 1. 山西工程职业学院,山西 太原 030001

    2. 中国矿业大学 矿业工程学院,江苏 徐州 221116

    3. 煤炭工业太原设计研究院集团有限公司,山西 太原 030001

  • 收稿日期:2025-01-04 修回日期:2025-03-10 出版日期:2025-08-11 发布日期:2025-09-11
  • 通讯作者: 赵正军 E-mail:342961934@qq.com

Layout of mining roadways and surrounding rock control technology in the lower coal seam of contiguous coal seams

  • Received:2025-01-04 Revised:2025-03-10 Online:2025-08-11 Published:2025-09-11
  • Contact: jun ZhengZHAO E-mail:342961934@qq.com

摘要:

针对极近距离煤层上部采空区及遗留煤柱制约下部煤层回采巷道布置、加剧维护难度的问题,以正利煤业14103工作面作为研究对象,采用理论分析、数值模拟与现场实测相结合的方法,开展回采巷道合理布置及围岩控制技术的研究。结果表明:4-1号煤层开采引发的底板最大破坏深度达11.46m,大于4-1号与4号煤层间8.75m的最大间距,导致4号煤层顶板发生损伤破坏并形成碎裂顶板;4-1号煤层遗留煤柱集中应力与4号煤层采动应力的叠加影响宽度为13.20m;4号煤层围岩应力集中程度及塑性区范围随与煤柱距离的增大呈递减趋势,当距离达15m时,二者均趋于稳定。现场实践验证:14103工作面回采巷道内错4-1号煤层采空区边缘15m布置,并采用“锚网索+W钢带+钢筋梯子梁”联合支护方案,可有效控制巷道围岩变形,确保4号煤层安全高效回采。

关键词:

极近距离煤层 , 下行开采 , 巷道布置 , 围岩控制 , 遗留煤柱

Abstract:

To address the issue that the goaf and residual coal pillars in the upper seam of contiguous coal seams severely restrict the layout and maintenance of the mining roadways in the lower coal seam, the No. 14103 working face of Zhengli Coal Mine was taken as the research object. Theoretical analysis, numerical simulation, and field measurements were employed to study the layout of mining roadways and surrounding rock control techniques on the 14103 working face. The results indicate that: ① The maximum floor damage depth in the No. 4-1 coal seam is 11. 46 m, which exceeds the maximum spacing between the No. 4-1 and No. 4 coal seams, which is 8. 75 m. The roof of the No. 4 coal seam is damaged and broken. ② The influence width of the concentrated stress on the No. 4 coal seam from the residual coal pillars in the No. 4-1 coal seam and the mining stress in the No. 4 coal seam is 13. 20 m. ③ The degree of stress concentration and the range of the plastic zone in the surrounding rock of the No. 4 coal seam decreases as it gets further from the coal pillar, and when the distance to the residual coal pillar is 15 m, the degree of stress concentration and the range of the plastic zone tend to stabilize. The filed practice showed that, mining roadways on the No. 14103 working face shows that, with the mining roadways arranged 15 m away from the edge of the goaf in the No. 4-1 coal seam and a combined support scheme of “anchor net cable+W steel belt+reinforced ladder beam”, the surrounding rock deformation of the roadways were controlled, ensuring the safe production of the No. 4 coal seam.