| [1] 张自政, 柏建彪, 王襄禹, 等. 我国沿空留巷围岩控制技术研究进展与展望[J]. 煤炭学报, 2023,48(11):3979-4000.Zhang Zizheng, Bai Jianbiao, Wang Xiangyu, et al. Research progress and prospects of surrounding rock control technology for gob-side entry retaining in China[J]. Journal of China Coal Society, 2023, 48(11): 3979-4000.[2] 樊星,黄宁,李宁,等.厚煤层沿空留巷柔模砼墙组合充填体关键参数研究[J].中国煤炭,2024,50(S2):72-78.Fan Xing, Huang Ning, Li Ning, et al. Research on key parameters of flexible formwork concrete wall composite backfill body in gob-side entry retaining of thick coal seams[J]. China Coal, 2024, 50(S2): 72-78.[3] 张国华, 李豫波, 李子波, 等. 倾斜煤层沿空留巷巷旁充填体承载特性及合理宽度研究[J]. 煤炭工程, 2024,56(7):84-91.Zhang Guohua, Li Yubo, Li Zibo, et al. Bearing characteristics and optimal width determination of roadside backfill body in gob-side entry retaining within inclined coal seams[J]. Coal Engineering, 2024, 56(7): 84-91.[4] 冯国瑞,马子杰,吴文达,等.综放充填体沿空留巷厚硬顶板预裂分组垮落控制机理研究[J/OL].煤炭学报,1-20[2025-08-14].https://doi.org/10.13225/j.cnki.jccs.2024.1620.Feng Guorui, Ma Zijie, Wu Wenda, et al. Control mechanism of thick-hard roof pre-splitting and grouped collapse in fully mechanized backfilling gob-side entry retaining[J/OL]. Journal of China Coal Society, 1-20 [2025-08-14]. https://doi.org/10.13225/j.cnki.jccs.2024.1620.[5] 李刚,刘航,迟国铭,等.大柳塔煤矿沿空留巷柔模砼墙支护阻力核定及失稳判据研究[J].工矿自动化,2025,51(01):145-155.Li Gang, Liu Hang, Chi Guoming, et al. Determination of support resistance and instability criterion for flexible-formwork concrete wall in gob-side entry retaining at Daliuta Coal Mine[J]. Industry and Mine Automation, 2025, 51(1): 145-155.[6] 王志强, 李航, 李敬凯. 柔模墙体沿空留巷合理宽度设计及应用[J]. 煤炭工程, 2022,54(9):1-5.Wang Zhiqiang, Li Hang, Li Jingkai. Optimal width design and application of flexible formwork wall in gob-side entry retaining[J]. Coal Engineering, 2022, 54(9): 1-5.[7] 杨依卓,杜超,温立成,等.沿空留巷柔模砼墙滞后临时支护时效性研究[J].中国煤炭,2024,50(S1):247-252.Yang Yizhuo, Du Chao, Wen Licheng, et al. Time-dependent behavior of delayed temporary support for flexible formwork concrete walls in gob-side entry retaining[J]. China Coal, 2024, 50(S1): 247-252.[8] 刘涛禹,张百胜,郭俊庆,等.切顶条件下沿空留巷组合充填体合理参数研究[J].矿业研究与开发,2024,44(06):34-41.Liu Taoyu, Zhang Baisheng, Guo Junqing, et al. Optimal parameter determination for composite backfill structures in gob-side entry retaining under roof-cutting conditions[J]. Mining Research and Development, 2024, 44(6): 34-41.[9] 严超超,张国恩,常通,等.浅埋中厚煤层沿空留巷底板变形力学分析及底鼓控制技术[J].煤炭科学技术,2024,52(10):11-20.Yan Chaochao, Zhang Guoen, Chang Tong, et al. Mechanical analysis of floor deformation and heave control technology for gob-side entry retaining in shallowly buried medium-thick coal seams[J]. Coal Science and Technology, 2024, 52(10): 11-20.[10] 冯超, 刘少伟, 张小东, 等. 切顶条件下综放沿空留巷充填体承载特征及合理宽度研究[J]. 采矿与安全工程学报, 2023,40(2):232-242.Feng Chao, Liu Shaowei, Zhang Xiaodong, et al. Bearing characteristics and optimal width determination of backfill body in fully-mechanized top-coal caving gob-side entry retaining under roof-cutting conditions[J]. Journal of Mining & Safety Engineering, 2023, 40(2): 232-242.[11] 辛亚军,杨俊鹏,陈祖国,等.薄分层软顶间隔柔模承载解析与快速留巷技术[J].采矿与安全工程学报,2023,40(06):1161-1176.Xin Yajun, Yang Junpeng, Chen Zuguo, et al. Mechanical analysis of interbedded flexible formwork bearing and rapid entry-retaining technology in thinly-layered soft roof strata[J]. Journal of Mining & Safety Engineering, 2023, 40(6): 1161-1176.[12] 宋宵, 石磊. 综放开采沿空留巷合理支护体宽度确定[J]. 煤炭技术, 2021,40(10):64-67.Song Xiao, Shi Lei. Determination of optimal support width for gob-side entry retaining in fully-mechanized top-coal caving mining[J]. Coal Technology, 2021, 40(10): 64-67.[13] 朱永建,任恒,王平,等. 倾斜厚层坚硬顶板条件下沿空留巷稳定性控制[J]. 中南大学学报(自然科学版),2023,54(3):956-966.ZHU Yongjian,REN Heng,WANG Ping,et al. Stability control of gob-side entry retention under the condition of inclined thick layer and hard roof[J]. Journal of Central South University(Science and Technology),2023,54(3):956-966.[14] 徐军,孟宁康,柏建彪.切顶沿空留巷充填体—矸石协同承载机理及控制技术研究[J].矿业安全与环保,2024,51(01):140-146.Xu Jun, Meng Ningkang, Bai Jianbiao. Synergistic bearing mechanism and control technology of backfill-gangue composite system in gob-side entry retaining with roof cutting[J]. Mining Safety & Environmental Protection, 2024, 51(1): 140-146.[15] 赵兵朝,韦启蒙,翟迪,等.切顶条件下“煤柱-充填体”协同承载性能及巷道稳定性分析[J].矿业研究与开发,2023,43(05):76-83.Zhao Bingchao, Wei Qimeng, Zhai Di, et al. Cooperative bearing performance of "coal pillar-backfill" system and roadway stability analysis under roof-cutting conditions[J]. Mining Research and Development, 2023, 43(5): 76-83.[16] 钱鸣高, 石平五, 许家林主编. 矿山压力与岩层控制[M]. 徐州:中国矿业大学出版社, 2010.Qian Minggao, Shi Pingwu, Xu Jialin (Eds.). Mine Pressure and Strata Control[M]. Xuzhou: China University of Mining and Technology Press, 2010.[17] 宋振骐, 文志杰, 蒋宇静, 等. 采动力学与岩层控制关键理论及工程应用[J]. 煤炭学报, 2024,49(1):16-35.Song Zhenqi, Wen Zhijie, Jiang Yujing, et al. Key theories and engineering applications of mining-induced dynamics and strata control[J]. Journal of China Coal Society, 2024, 49(1): 16-35.[18] 白锦文, 崔博强, 戚庭野, 等. 关键柱柱旁充填岩层控制基础理论[J]. 煤炭学报, 2021,46(2):424-438.Bai Jinwen, Cui Boqiang, Qi Tingye, et al. Fundamental theory of strata control through pillar-side backfilling in key pillar zones[J]. Journal of China Coal Society, 2021, 46(2): 424-438.[19] 柏建彪,张自政,王襄禹,等. 高水材料充填沿空留巷应力控制与围岩强化机理及应用[J]. 煤炭科学技术,2022,50(6):16-28.Bai Jianbiao, Zhang Zizheng, Wang Xiangyu, et al. Stress control and surrounding rock reinforcement mechanism of high-water material backfilling in gob-side entry retaining with engineering applications[J]. Coal Science and Technology, 2022, 50(6): 16-28.[20] LIU J, HE M, HOU S,et al. Force change of the gravel side support during gangue heaping under a new non-pillar-mining approach[J]. Geomechanics and Engineering, 2021, 27(1): 31-43. |