| [1] |
.
[J]. Coal Engineering, 2025, 57(8): 49-56.
|
| [2] |
.
[J]. Coal Engineering, 2025, 57(8): 57-63.
|
| [3] |
.
[J]. Coal Engineering, 2025, 57(8): 64-71.
|
| [4] |
.
[J]. Coal Engineering, 2025, 57(8): 88-96.
|
| [5] |
.
[J]. Coal Engineering, 2025, 57(8): 112-121.
|
| [6] |
.
[J]. Coal Engineering, 2025, 57(8): 122-129.
|
| [7] |
.
[J]. Coal Engineering, 2025, 57(8): 146-152.
|
| [8] |
.
[J]. Coal Engineering, 2025, 57(8): 161-170.
|
| [9] |
.
[J]. Coal Engineering, 2025, 57(8): 171-177.
|
| [10] |
.
[J]. Coal Engineering, 2025, 57(8): 178-187.
|
| [11] |
.
[J]. Coal Engineering, 2025, 57(8): 188-195.
|
| [12] |
.
[J]. Coal Engineering, 2025, 57(8): 196-202.
|
| [13] |
.
[J]. Coal Engineering, 2025, 57(8): 203-210.
|
| [14] |
.
Research on key technologies for reducing subsidence through grouting
in separated strata of overburden rock under the influence of faults
[J]. Coal Engineering, 2025, 57(7): 8-16.
|
| [15] |
.
Study on the bearing deformation and width of coal pillar under the
action of overburden movement in gob-side roadway
[J]. Coal Engineering, 2025, 57(7): 45-52.
|