COAL ENGINEERING ›› 2013, Vol. 45 ›› Issue (9): 79-82.doi: 10.11799/ce201309028
Previous Articles Next Articles
Received:
Revised:
Online:
Published:
Abstract:
The UDEC numerical simulating was used to study roof movement laws under different conditions such as different coal thickness ,dip angle and length of workface under the engineering background of steep coal seam workface in Xinqiang Coal Mine. The research shows that the range of overburden’s destruction is mainly on the up and middle of goal. Because of slide instability the upper roof make tensile fracture and the phenomenon of floor heave is serious. The overburden move will become more severe when adding coal seam dip angle, thickness and workface length. The coal seam dip angle is the most important one among all the factors. This research achievement possesses theoretical guiding significance for the stability of surrounding rock and support system on steep coal seam workface.
Key words: deeply inclined coal seam, numerical simulating, roof movement laws
CLC Number:
TD323
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: http://www.coale.com.cn/EN/10.11799/ce201309028
http://www.coale.com.cn/EN/Y2013/V45/I9/79
[1] 袁 永,屠世浩,窦凤金等.大倾角综放面支架失稳机理及控制[J].采矿与安全工程学报,2008,25(4):430-434. [2] 房虎林,曹连民,岳永强.大倾角液压支架稳定性研究[J].煤矿机械,2008,(12):54-55. [3] 伍永平,员东风.大倾角综采支架稳定性控制.矿山压力与顶板管理.1999,(3-4),82-85. [4] 秦玉宝.大倾角三架组液压支架防滑防倒计算及稳定性分析[J].西安矿业学院学报,1988,(4):67-74. [5] 吴士良,程元祥,安伯超.大倾角综采工作面设备防滑和防倒技术[J].煤矿开采,2006,(3):34-35. [6] 徐涛.大倾角综放工作面液压支架稳定性技术探讨[J].煤炭科学技术,2007,(9):58-62.