COAL ENGINEERING ›› 2014, Vol. 46 ›› Issue (7): 22-23.doi: 10.11799/ce201407008
Previous Articles Next Articles
Received:
Revised:
Online:
Published:
Abstract:
Mine hoist system on the saving, People think there is energy-efficient speed. The purpose of this article is to DC and variable frequency drive system energy calculation and analysis。Argumentation in hoist auxiliary device, deflector, under the same motor and The same acceleration and deceleration, power consumption per ton of coal and lifting height, lifting speed and enhance the relationship between the load and the following conclusions For a given lift height and capacity building to enhance the system, Whether using a large amount of lift Q, a smaller increase speed V; still use a larger increase speed V, a small amount of lift Q, its electricity consumption per ton of coal will not change. Power consumption per ton of coal and lift height only, but no with lifting speed and lifting loads are irrelevant.
Key words: Increase speed, DC or frequency, tons of coal power consumption, imbalance upgrade, economic operation
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: http://www.coale.com.cn/EN/10.11799/ce201407008
http://www.coale.com.cn/EN/Y2014/V46/I7/22
1李玉瑾、寇子明.矿井提升系统基础理论,煤炭工业出版社,2013 2 Feyrer Klas. Wire Rope,2007 3矿山固定设备使用手册,煤炭工业出版社,2013 4 煤矿在用提升机节能监测方法和判定规则 MTT 1001-2006 煤炭工业出版社,2006 5 煤矿井工开采单位产品能源消耗限额 中国标准出版社 2012