COAL ENGINEERING ›› 2014, Vol. 46 ›› Issue (7): 61-63.doi: 10.11799/ce201407021
Previous Articles Next Articles
Received:
Revised:
Online:
Published:
Abstract:
Introduced dust generation source in the production process of coal washing in Xinzhuang Coal Preparation Plant, analyzed forming reasons of the coal dust in production, transportation, storage, shipping links, according to the present production system, reduced coal dust concentration by precipitators arranged, material chute and transport belts enclosed, watered in coal dust and coal storage yard, cut down wind pressure in equipment outlet, exhaust devices installed, anti-crushing device increased on the transfer point and the feeding inlet, results show that has remarkable economic and social benefits through the management and transformation, various links of coal dust concentration is controlled in 10 mg / m3 below, generate annual profits about 1.06 million yuan.
Key words: Coal Preparation Plant, Coal dust, Causes, Measures and methods, Government effect
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: http://www.coale.com.cn/EN/10.11799/ce201407021
http://www.coale.com.cn/EN/Y2014/V46/I7/61
[1] 谢广元,选矿学。北京:中国矿业大学出版社,2001:178。 [2] 徐仁峰,准格尔选煤厂粉尘综合治理实践[J],实用技术,2009:122。 [3] 王传兴,选煤厂煤尘治理其防治[J],选煤技术,2000:(5)。 [4] 崔莉莉,布袋除尘器在选煤厂煤尘处理中的应用[J],矿山天地,2005:(2)。 [5] 李浩,选煤厂煤尘及其防治[J],选煤技术,2010:(5)。