Abstract:
By the multiple faults affect Chen four floor coal mine 21501 working face ending work during the construction period, working surface structure affected lots obvious pressure appearance, broken roof, the ending work has been seriously affected. Considering comprehensivly about the surface mine pressure regularity, hydrogeololgy, blasting parameters , support parameter ,back line , and other factors, Many techniques have been adopted such as broken zone of bottom grouting strengthening, Strengthen the management of broken roof, select blasting parameters reasonably, strengthen the state management support operation, Increase channel support strength、optimize back line other control measures to administrate the ending work of fully mechanized mining face under complex structure. Good results were gained after the innovation . this study provides valuable experiences for fully mechanized mining face under the complex geological conditions.
Key words: ending work, roof fracture, complicate structure, bottom grouting, blasting, supporting parameters
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: http://www.coale.com.cn/EN/10.11799/ce201411014
http://www.coale.com.cn/EN/Y2014/V46/I11/42
[1]张文涛.综采工作面回撤前收尾阶段施工技术研究[J].煤炭工程,2013,(8):47-49 [2]李建宏,范在良,和宏伟,等.综采工作面的安全回撤方法[J].煤矿安全,2001,(7):17-18 [3]郭金明.综采工作面破碎顶板控制技术[J].煤炭工程,2008,(5):31-32 [4]杨 威.爆破技术在综采工作面过大断层的实践应用[J].山西焦煤科技,2010,(3):27-28 [5]张红革.大倾角综采工作面过落差11m大断层开采与实践[J].煤炭技术,2008,27(10):44-45 [6]窦林名,邹喜正,曹胜根,等.煤矿围岩控制与监测[M].徐州:中国矿业大学出版社,2008:71-7 [7]杜计平,汪理全.煤矿特殊开采方法[M]徐州:中国矿业大学出版社,2005:144-14