

Coal Engineering ›› 2019, Vol. 51 ›› Issue (10): 36-39.doi: 10.11799/ce20191009
Previous Articles Next Articles
Received:2018-07-24
Revised:2018-11-03
Online:2019-10-21
Published:2020-05-09
CLC Number:
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
| [1] | 矿井防治水规定 [M]. 北京:煤炭工业出版社,2009. |
| [2] | 陈立武.东庞矿特大突水灾害治理技术 [M].北京:煤炭工业出版社,2005. |
| [3] | 武文清,李冲.隐伏陷落柱探查与治理技术研究与应用 [J].煤炭与化工,2016,39(12):31-34. |
| [4] | 伊利娟,赵 洪,徐青云.巷道穿过断层影响破碎带支护技术研究 [J].煤炭工程,2018,50(4):48-50. |
| [5] | 南生辉,蒋勤明,郭晓山,等.导水岩溶陷落柱堵水塞建造技术 [J].煤田地质与勘探,2008,36(4):29-33. |
| [6] | 周朝辉.岩巷掘进过断层防治水技术 [J].煤炭工程,2015,47(4):54-56. |
| [7] | 徐士发,陈雄,廖茂俊.铜仁天生桥水电站溶洞堵洞体结构计算 [J].贵州水力发电,2007,21(3):39-43. |
| Viewed | ||||||
|
Full text |
|
|||||
|
Abstract |
|
|||||