Coal Engineering ›› 2020, Vol. 52 ›› Issue (7): 45-48.doi: 10.11799/ce202007011
Previous Articles Next Articles
Received:
Revised:
Online:
Published:
Abstract: Aiming at the shortcomings of "Reverse design" in coal preparation plant,this paper shares the research on coal preparation plant top-down design with BIM,gives out the flow of top-down design with BIM, the process of implementation and the method of model creation,finds out the acclimatization problem of Dassault 3DE system,explores preliminarily the method of coal preparation plant top-down design with BIM. The research can Provide evidences and information for other units that want to conduct research on coal preparation plant top-down design with BIM.