COAL ENGINEERING ›› 2013, Vol. 45 ›› Issue (9): 38-40.doi: 10.11799/ce201309015
Previous Articles Next Articles
Received:
Revised:
Online:
Published:
Abstract:
In the process of the construction of the new River mine, the series of the related pressure behaved very strongly when the excavation roadway driving through the faults. The main roadway could one-time excavated the faults zone successfully with the joint support of the bolting and metal mesh, the bolting and shotcreting and the fully enclosed u-steel support, after injecting the slurry into the advanced boreholes to reinforce the self-supporting capability of the surrounding rocks. It had been verified a safe and cost-effective method in the new river colliery and can also maintained the stability of the excavation roadway.
Key words: the main roadway, the fracture zone of faults, the initiative of enhanceing support, the fully enclosed u-steel support
CLC Number:
TD 82
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: http://www.coale.com.cn/EN/10.11799/ce201309015
http://www.coale.com.cn/EN/Y2013/V45/I9/38
【1】康红普.巷道底鼓的挠曲效应及卸压效果的分析[J].煤炭学报,1992,17(1):37-52. 【2】何满潮,张国峰,王桂莲,等.深部煤巷底臌控制机制及应用研究[J].岩石力学与工程学报,2009,28(增1):2593-2598. 【3】姜耀东,赵毅鑫,刘文岗,等.深部开采中巷道底臌问题的研究[J].岩石力学与工程学报,2004,23(14):2396–2401.