[1] |
.
Optimization of Open-Pit Mine Drainage Scheme Based on AHP-GRAP Method
[J]. , 2019, 51(6): 0-0.
|
[2] |
FAN ZHENGXIANG.
Open pit stripping ratio and special cases must to be paid attention
[J]. COAL ENGINEERING, 2019, 51(5): 56-59.
|
[3] |
.
Research on optimization of steering scheme in Tianchi Energy Nan open-pit mine in Xinjiang
[J]. COAL ENGINEERING, 2019, 51(5): 60-64.
|
[4] |
.
Application Status and Existing Problems Analysis of Dragline Stripping Technology in China
[J]. COAL ENGINEERING, 2019, 51(1): 28-34.
|
[5] |
.
Elastic-Plastic FEM Computing Method for Wet Slope Stability of Open Coal Mine
[J]. COAL ENGINEERING, 2019, 51(1): 96-100.
|
[6] |
.
[J]. COAL ENGINEERING, 2018, 50(10): 150-153.
|
[7] |
zhu haibin.
[J]. COAL ENGINEERING, 2018, 50(10): 162-166.
|
[8] |
.
The Stability Dynamic Analysis of overlying rock mass in Goaf about East Open-pit Coal Mine
[J]. COAL ENGINEERING, 2018, 50(8): 10-13.
|
[9] |
.
The evaluation model of open pit slope risk based on intuitionistic fuzzy entropy weight method
[J]. COAL ENGINEERING, 2018, 50(8): 153-157.
|
[10] |
.
Study on influence of fault angle on stability of dip bedded slope in mines
[J]. COAL ENGINEERING, 2018, 50(5): 94-96.
|
[11] |
.
Optimization Analyze on the Presser Foot Tracing Distance of Internal Dumping in Open-pit mine Based on 3DEC
[J]. COAL ENGINEERING, 2018, 50(5): 37-40.
|
[12] |
.
Optimization Study on loose blasting parameters of deep hole step in Heidaigou open pit coal mine
[J]. COAL ENGINEERING, 2018, 50(3): 22-26.
|
[13] |
.
Study on optimization of Baorixile Open-pit mine opening and transportation system
[J]. COAL ENGINEERING, 2018, 50(3): 27-29.
|
[14] |
.
Determination of Production Intensity for Cross Mining and Internal Dumping in Zaha Nur Surface Mine
[J]. COAL ENGINEERING, 2018, 50(2): 23-25.
|
[15] |
.
Research of Inner Dumping by Building End Slope Bridge in the Tracing Parallel Open Pit Mine
[J]. COAL ENGINEERING, 2018, 50(1): 16-18.
|