COAL ENGINEERING ›› 2018, Vol. 50 ›› Issue (5): 87-89.doi: 10.11799/ce201805024
Previous Articles Next Articles
Received:
Revised:
Online:
Published:
Contact:
Abstract: The average raw coal throughput of Halagou coal preparation plant is 3000t/h. The basic technology process is +13 mm raw coal was separated by three sets of shallow trough, besides -13mm raw coal was separated by heavy medium cyclone separation or directly was carried into the products storehouse. The cost of lump coal system is less 8.12 yuan/ton than the slack coal. After the feeding limit is adjusted from +13mm to +6mm, lump feeding increases 302.62t/h. The cleaned coal yield of theory is 85.51%, increasing 2.17%. The cleaned coal ash of theory is 4.61%, decreasing 4.61%. The quantity efficiency is 94.62%, increasing 4.28%. After all, this cost can be economized more than four hundred ten thousand yuan per year.
CLC Number:
TD94
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: http://www.coale.com.cn/EN/10.11799/ce201805024
http://www.coale.com.cn/EN/Y2018/V50/I5/87