COAL ENGINEERING ›› 2019, Vol. 51 ›› Issue (3): 71-73.doi: 10.11799/ce201903016
Previous Articles Next Articles
Received:
Revised:
Online:
Published:
Abstract: According to the problem of high gas in TangShan mine, the source of gas is explored from many angles, Without affecting the progress of the project and minimizing investment ,The comprehensive gas control measures, such as increasing the air volume at the working face, gas drilling and drainage in the head-on construction of the working face, and improving the tunneling technology, have been adopted, and good results have been achieved, which opens up a new way for gas control in high gas long distance driving face. Key words: The long distance ; driving face ; gas governance
CLC Number:
TD712+.6
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: http://www.coale.com.cn/EN/10.11799/ce201903016
http://www.coale.com.cn/EN/Y2019/V51/I3/71