COAL ENGINEERING ›› 2014, Vol. 46 ›› Issue (8): 88-90.doi: 10.11799/ce201408028
Previous Articles Next Articles
Received:
Revised:
Online:
Published:
Abstract:
Huating coal mine mining the fifth coal layer, the largest mining depth is about 800m. The fifth coal layer is thick coal seam, average thickness 37.5m,coal seam dip angle 0~9°,strong rockburst proneness. In order to prevent rockburst and raise mine safety coefficient, By theoretical calculation, numerical simulation, field observation method, we analysis the impact of stress variation and abutment pressure in the narrow coal pillar and working face. By analyse the deformation rule of the narrow coal pillar and the excursion of four different width coal pillar plastic zone , we finally get the property width of section coal pillar of Yanbei mine.
Key words: super high seam, high rock pressure, narrow coal pillar, parameter
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: http://www.coale.com.cn/EN/10.11799/ce201408028
http://www.coale.com.cn/EN/Y2014/V46/I8/88
杨开贵.窄煤柱沿空掘巷及其维护分析[J].煤炭科学技术,2002,(2):40一41,45。 刘增辉,康天合.综放煤巷台理煤柱尺寸的物理模拟研究[J].矿山压力与顶板管理.2005.22(1):24—26. 张宝安,黄明利,梁宏友.窄煤柱护巷机理的数值模拟分析[J].辽宁工程技术大学学2003,(51):91一92。 温克布.窄小煤柱护巷的矿压显现规律及其支护技术研究.西安科技大学.2005:30一40。 毕宣可,战玉宝,王玉.护巷小煤柱留设的可行性研究[J].中国矿业,2007,(09):53一56。 林健,吴拥政,申志平,刘小峰.宁武煤矿小煤柱护巷技术及其应用[J].煤炭科学技术,2005,(12):5一7。