煤炭工程 ›› 2017, Vol. 49 ›› Issue (1): 84-86.doi: 10.11799/ce201701025

• 研究探讨 • 上一篇    下一篇

缺陷群防治冲击地压技术研究

潘立友,段大勇,张振扬   

  1. 山东科技大学
  • 收稿日期:2015-12-10 修回日期:2016-02-25 出版日期:2017-01-09 发布日期:2017-04-13
  • 通讯作者: 段大勇 E-mail:317993939@qq.com

Research on prevention and control of rock burst with defects group

  • Received:2015-12-10 Revised:2016-02-25 Online:2017-01-09 Published:2017-04-13

摘要: 根据对深部孤岛煤柱冲击地压的防治技术研究,建立了用缺陷群防控高能量冲击地压的理论框架,分别通过数值模拟和力学分析揭示了工程和断裂缺陷防治冲击地压的机理。在此基础上把缺陷群防冲措施应用在开滦唐山矿T1391工作面中,掌握了煤层冲击能量释放规律,避免发生冲击地压事故,保证了工作面安全回采。

关键词: 冲击地压, 缺陷群, 工程缺陷, 断裂缺陷, 孤岛工作面

Abstract: Based on the research of prevention techniques on the deep island coal pillar coal bump, a theoretical framework for the prevention and control of high energy rock burst with a defects group is established. The mechanism of apply the engineering and the fracturing defect to prevent and control the rock burst is revealed by the numerical simulation and mechanical analysis. On this basis,the prevention and control of rock burst with a imperfection group measures used in T1391 working face in Tangshan mine in Kailuan,it could validly change the impact energy release law of coal seam and avoid the occurrence of rock burst accidents, and ultimately ensure the safety of working face mining.

中图分类号: