煤炭工程 ›› 2020, Vol. 52 ›› Issue (4): 6-11.doi: 10.11799/ce202004002

• 设计技术 • 上一篇    下一篇

大宁煤矿阶段式高水材料充填沿空留巷技术应用研究

韩俊效,马晋民,石晋松,陈勇   

  1. 山西亚美大宁能源有限公司
  • 收稿日期:2019-05-07 修回日期:2019-11-10 出版日期:2020-04-20 发布日期:2020-07-22
  • 通讯作者: 韩俊效 E-mail:sita163@163.com

Study on Application of Phase High Water Material Filling along Empty Lane in Daning Coal Mine

  • Received:2019-05-07 Revised:2019-11-10 Online:2020-04-20 Published:2020-07-22

摘要: 针对大宁煤矿突出煤层大采高工作面多巷布置及上隅角瓦斯超限等问题,进行井上井下抽采系统改造,为保证工作面后方不透风和瓦斯排放的可靠性,提出了采用阶段式沿空留巷来实现工作面五进两回的偏Y型通风的方案,以期解决上隅角瓦斯超限难题,以大宁煤矿304工作面为工程背景,采用理论分析、数值模拟及现场实践相结合的方法,确定合理阶段长度和充填体支护宽度。研究表明,大宁煤矿阶段式沿空留巷围岩运动经历了采动影响阶段、留巷稳定阶段两个阶段,在工作面后方0~40m,沿空留巷围岩变形明显,40~60m趋向稳定,满足沿空留巷使用要求|同时,改善了工作面的通风系统,解决了工作面后方采空区通风问题。

关键词: 高水充填, 沿空留巷, 充填体宽度, 围岩控制

Abstract: In order to solve the problem of high gas working face with multi-entry layout and the upper corner gas overrun under large mining heightand the improvement of the underground extraction system in the well, the invention can ensure the reliability of the non-wind and the gas discharge behind the working surface, The method of combining the theoretical analysis, the numerical simulation and the on-site practice is adopted to solve the problem that the gas over-limit of the upper corner of the upper corner is solved in a way that the partial Y-type ventilation of the working surface 5 and the two times of the working surface is realized by the stage-type gob-side entry way, However, the key to the realization of the stage-type gob-side entry is to determine the reasonable stage length and the support width of the filling body. The research shows that the movement of the surrounding rock of the Dayin coal mine along the gob-side retaining tunnel has experienced the influence of the mining and moving, the two stages of the retaining-lane stability stage,0-40m behind the working face, obvious deformation of the surrounding rock along the air-retaining tunnel, the stability of the 40-60m trend, and the requirements for the use of the gob-side entry; and at the same time, The ventilation system of the working surface is improved, and the ventilation problem of the goaf behind the working surface is solved.

中图分类号: