煤炭工程 ›› 2020, Vol. 52 ›› Issue (10): 92-97.doi: 10.11799/ce202010019

• 研究探讨 • 上一篇    下一篇

煤层预抽后残余瓦斯含量分布影响控因研究

丁红   

  1. 中煤科工集团重庆研究院有限公司
  • 收稿日期:2019-09-19 修回日期:2019-12-13 出版日期:2020-10-16 发布日期:2020-12-11
  • 通讯作者: 丁红 E-mail:cqcctegdh@gmail.com

Study on the Controlling Factors of Residual Gas Content Distribution after Pre-pumping of Coal Seams

  • Received:2019-09-19 Revised:2019-12-13 Online:2020-10-16 Published:2020-12-11

摘要: 针对煤层预抽影响因素多、无法准确预测残余瓦斯含量分布的难题,基于煤岩体力学理论分析残余瓦斯含量分布的影响因素,并以平庆煤矿117802回采工作面为研究对象,对不同因素影响下的残余瓦斯含量分布规律和控制机理进行研究。结果表明:117802回采工作面残余瓦斯含量呈离散型和高含量集中分布,主要受控于采掘活动与地质构造的复合应力作用和预抽时间|残余瓦斯含量呈现明显的复合应力作用区域特征,由集中应力往卸压作用区域规律性递减,依次为窄煤柱集中应力、宽煤柱集中应力、采空区—煤柱区—断层带共同影响、采空区卸压和采空区—断层带共同卸压|残余瓦斯含量与预抽时间呈现负相关关系,预抽2~6月后平均值大于8m3/t,预抽7~10月后平均值均小于8m3/t。

关键词: 煤层预抽, 残余瓦斯含量, 保护层, 原始瓦斯含量

Abstract: In view of the many factors of coal seam pre-pumping, it is not possible to accurately predict the distribution of residual gas content, based on the theory of coal & rock physical strength to analyze the influence factors of residual gas content distribution, and based on the PingQing coal mine 117802 back-mining work surface as the research object, the residual gas content distribution law and control mechanism under the influence of different factors. The results show that the residual gas content of the back-mining surface is discrete and high-concentration distribution, mainly controlled by the pre-pumping time and combined stress action of mining activities and geological formations, and the residual gas content shows obvious characteristics of the compound stress action area, which decreases regularly from the concentrated stress to the discharge area, in order: narrow coal column concentrated stress, wide coal column concentrated stress , the mining area - coal column area - fault zone co-influence, the extraction area discharge pressure and the mining area - fault zone joint discharge pressure; the residual gas content and the pre-pumping time show a negative correlation, the average value after 2 to 6 months of pre-pumping is greater than 8 m3/t, the average value after the pre-pumping 7 to 10 months is less than 8 m3/t.

中图分类号: