煤炭工程 ›› 2021, Vol. 53 ›› Issue (4): 66-70.doi: 10.11799/ce202104014

• 生产技术 • 上一篇    下一篇

乌审旗典型工作面停复采冲击危险性分析与防治#br#
#br#

刘毅涛1,王颜亮2,曲效成3,魏全德3,4,5,董亚东1,张松林4,徐旭4,韩亮6   

  1. 1. 鄂尔多斯市伊化矿业资源有限责任公司
    2. 北京安科兴业科技股份有限公司 北京安科兴业矿山安全技术研究院有限公司
    3. 北京安科兴业科技股份有限公司
    4. 北京安科兴业矿山安全技术研究院有限公司
    5. 北京科技大学
    6. 华北科技学院
  • 收稿日期:2020-08-10 修回日期:2020-11-23 出版日期:2021-04-20 发布日期:2021-05-17
  • 通讯作者: 王颜亮 E-mail:wangyanliang1987@163.com

Hazard analysis and prevention of rock burst in the process of stoping and resuming mining of typical working faces in Wushen County in Inner Mongolia

  • Received:2020-08-10 Revised:2020-11-23 Online:2021-04-20 Published:2021-05-17
  • Contact: wang yanliang E-mail:wangyanliang1987@163.com

摘要: 以母杜柴登煤矿30202工作面为工程背景,对工作面停复采期间的矿压监测数据进行分析,分析了工作面停复采前后矿压显现规律,提出了停复采过程中冲击地压防治的关键技术。分析结果表明:工作面停采后,微震事件能量及频次明显降低,煤层应力及支架阻力数据明显增大|工作面复采后,震动场活动强度整体经历“突增—降低—小幅增高”三个阶段|工作面复采初期前40刀(约35m)为冲击地压防治的关键区域|提出了停复采期间 “应力预警-险情钻检确认-卸压解危-解危效果验证”为主要内容的冲击地压危险区处理流程,30202工作面实践效果良好,可为乌审旗地区相似条件工作面停复采期间的冲击地压防治提供借鉴。

关键词: 乌审旗地区, 冲击地压, 停复采, 监测数据分析

Abstract: Based on the background of muduchaideng mine in Inner Mongolia and Shaanxi base, the monitoring data of ground pressure in the process of stopping and resuming mining of long and large working face are analyzed, and the law of ground pressure behavior before and after stopping and resuming mining is studied. Finally, the key technologies of rock burst prevention and control in the process of stopping and resuming mining are summarized. It shows that: before and after stoppage, the energy and frequency of microseismic time significantly reduces, and the data of coal seam stress and support resistance significantly increases; the activity intensity of vibration field goes through sudden increase to decrease and finally to small increase; the first 40 knives (about 35m) in the initial stage of remining are the key areas for rock burst prevention and control; In on-site dangerours area, the workflow of "early warning, drilling and inspection confirmation of dangerous situation, pressure and danger relief, effect verification" works well ; the key measures for rock burst prevention and control in the process of stopping and resuming mining are conclueded, which provides guidance for the prevention and treatment of rock burst in mining face with similar conditions in n Inner Mongolia and Shaanxi base.