建筑物下四阶段条带膏体充填开采技术与应用

宋英明1,刘东升1,刘浪2,王美2,苏臣3,杨震3,徐庆路3   

  1. 1. 河南省煤层气开发利用有限公司
    2.
    3. 榆林泰发祥矿业公司
  • 收稿日期:2021-12-10 修回日期:2022-04-26 出版日期:2022-08-15 发布日期:2022-09-06
  • 通讯作者: 宋英明 E-mail:18603759900@163.com

Mining technology and application of four-stages strip paste backfill in under buildings

  • Received:2021-12-10 Revised:2022-04-26 Online:2022-08-15 Published:2022-09-06

摘要: 我国建筑物下压煤量巨大,为了解放出建筑物下煤炭资源,延长矿井服务年限,以麻黄梁煤矿的开采条件为背景,提出了建筑物下四阶段条带膏体充填开采技术,并确定了合理的工艺参数。以处置煤矸石固废为出发点,制备了矸石膏体充填材料并分析了其性能,阐述了四阶段膏体充填工艺流程,设计了充填条带封堵以及高效接顶工艺,结合现场实际应用情况分析了四阶段条带膏体充填开采的效果及经济效益。研究与实践表明:矸石膏体充填材料流动、力学性能均满足麻黄梁煤矿充填要求,采用四阶段膏体充填开采技术开采后,充填体接顶率达98%以上,地表建筑物变形与移动最大变形值均在设防指标内,实现了煤矿建筑物下充填采煤的成功实践。该开采方法可解放麻黄梁煤矿约10Mt建筑物下煤炭资源,延长了矿井服务年限,联合处置了煤矸石,避免了矸石堆存对生态环境的影响,具有良好的经济与社会效益,研究为榆阳区及周边矿井的“三下”开采提供有益借鉴。

关键词: “三下”压煤, 充填开采, 矸石膏体, 四阶段条带

Abstract: There is a huge amount of coal under buildings in China, and the current mining methods cannot safely and efficiently extract coal resources under buildings, making a large amount of coal resources unable to be effectively recovered. In order to liberate the coal resources under the building and extend the service life of the mine, based on the mining conditions of the Mahuangliang coal mine, a four-stage strip paste backfill mining technology under the building was proposed, and reasonable process parameters were determined. Taking the disposal of solid waste of coal gangue as the starting point, a gangue paste backfill material is prepared and its performance is analyzed. The four-stage paste backfill process is described, and the backfill strip plugging and high-efficiency roof connection process are designed. Combined with the field application, the effect and economic benefit of four-stage strip paste backfill mining are analyzed. The research and practice show that the flow and mechanical properties of gangue paste backfill material meet the backfill requirements of Mahuangliang coal mine. After mining with four-stage paste backfill mining technology, the roof connection rate of backfill body is more than 98%, and the maximum deformation value of surface building deformation and movement is within the fortification index, which realizes the successful practice of backfill coal mining under coal mine buildings. This mining method can liberate the coal resources under the building of about 10Mt in Mahuangliang Coal Mine, extend the service life of the mine, jointly dispose of coal gangue, and avoid the impact of gangue stacking on the ecological environment. It has good economic and social benefits. The research provides a useful reference for the "three under" mining of Yuyang District and surrounding mines.