煤炭工程 ›› 2024, Vol. 56 ›› Issue (1): 70-77.doi: 10.11799/ce202401011

• 施工技术 • 上一篇    下一篇

成熟区块煤层气加密井堵漏工艺优选

李蜀涛,朱韩友,尹中山,等   

  1. 1. 四川省能源地质调查研究所
    2. 四川省煤田地质工程勘察设计研究院
  • 收稿日期:2022-12-21 修回日期:2023-02-10 出版日期:2024-01-20 发布日期:2024-01-29
  • 通讯作者: 朱韩友 E-mail:1767444757@qq.com

Plugging technology optimization of coalbed methane infill well in mature block- Take Qinshui Basin as an example

  • Received:2022-12-21 Revised:2023-02-10 Online:2024-01-20 Published:2024-01-29

摘要: 为解决沁水盆地成熟区块加密井钻井施工过程中井漏的问题,基于研究区块实钻井身结构,建立三维井筒裂缝模型,采用Ansys-Fluent软件分别模拟常规堵漏浆、承压堵漏浆、凝胶堵漏浆在地层裂缝中的流动情况,并利用现场施工实例对仿真结果进行验证。结果表明:堵漏耗时方面,凝胶堵漏<承压堵漏<常规堵漏|固井环空水泥返高方面,凝胶堵漏>承压堵漏>常规堵漏|完井承压耗时方面,凝胶堵漏<承压堵漏<常规堵漏|结合三种堵漏工艺的优缺点表明:若发生单点漏失,且漏失层位明确,则采用凝胶堵漏效果较好|若漏失点较多,且漏失层位不明确,则采用承压堵漏效果较好。此外,优选堵漏工艺结合井口加压工艺相对于常规静止堵漏工艺,堵漏耗时更短,漏失地层承压能力更高,堵漏效果更好,且所需承压设备现场易制作,操作简单,适用性更强。

关键词: 沁水盆地, 煤层气, 井漏, 堵漏工艺, 常规堵漏, 承压堵漏, 凝胶堵漏

Abstract: In order to solve the problem of lost circulation during infill drilling in mature blocks of the Qinshui basin, a 3D wellbore fracture model was developed based on the study of the actual well bore structure in the blocks, Ansys-fluent software is used to simulate the flow of conventional mud plugging, pressure mud plugging, gel mud plugging in formation fractures, and the simulation results are verified by field construction examples. The results show that the time of plugging (Gel plugging < Pressure plugging <Conventional plugging) , the return height of cementing annulus cement (Gel plugging > Pressure plugging > Conventional plugging); Combined with the advantages and disadvantages of the three lost circulation techniques, it is shown that the effect of gel plugging is better if a single point loss occurs and the lost circulation location is clear If the leakage point is more, and the leakage location is not clear, then the pressure plugging effect is better. In addition, compared with the conventional static plugging technology, the optimized plugging technology combined with wellhead pressure technology has the advantages of shorter plugging time, higher pressure bearing capacity of the lost formation and better plugging effect, and the required pressure bearing equipment is easy to make on the spot, simple operation, stronger applicability.