[1] 中国煤炭工业协会《2022煤炭行业发展年度报告》China National Coal Association.《2022 annual report on the development of the coal industy》[2] 赵益芳.矿井防尘理论及技术[M].北京:煤炭工业出版社,1995:2-3.ZHAO Yifang.Mine dust control theory and technology[M].Bejing:China Coal Industry Publishing House,1995:2-3.[3] 付文俊.基于负压吸附的井筒施工安监机器人技术研究[J].煤矿安全,2022,53(08):112-119.FU Wenjun.Research on wellbore construction safety monitoring robot technology based on negative pressure adsorption[J].Safety in Coal Mines,2022,53(08):112-119.[4] 杨仁树,陈骏.立井施工装备与技术发展现状和展望[J].建井技术,2015,36(02):1-4.YANG Renshu,CHEN Jun.Development Status and Prospects of Mine Shaft Construction Equipment and Technology[J].Mine Construction Technology,2015,36(02):1-4.[5] 王鹏越,张小美,龙志阳,等.千米深井基岩快速掘砌施工工艺研究[J].建井技术,2011,32(1):26-28WANG Pengyue, ZHANG Xiaomei, LONG Zhiyang, et al. Study onrapid excavation and lining construction technique for base rocksection in 1000m depth mine shaft [i] .Mine Construction Technology,2011,32(1):26-28[6] 纪洪广.“十三五”国家重点研发计划重点专项项目“深部金属矿建井与提升关键技术”开始实施[J].岩石力学与工程学报,2016,35(9):1.JI Hongguang. The key projects of thenational key research and development plan of the 13th five-year plan , “ deep metal mining and upgrading key technologies , have been implemented[J]. Chinese Journal of Rock Mechanics and Engineering,2016,35(9):1.[7] 徐辉东,杨仁树,刘林林,等.大直径超深立井凿井新型提绞装备研究及应用[J].煤炭科学技术,2015,43(7):89-92XU Huidong,YANG Renshu,LIU Linlin.Study and application of new hoisting equipment to large diameter ultra deep mine shaft sinking[J].Coal Science and Technology,2015,43(7):89-92[8] 邱家琴.变频调速系统在深井井筒装备施工中的应用[J].机电信息,2013(24):85-86QIU Jiaqin. Application of frequency conversion speed regulation system in deep well shaft equipment construction [J]. Mechanical and Electrical Information, 2013(24):85-86[9] 张小美,吕红娟.超深立井安全高效施工辅助系统关键技术现状与展望[J].能源技术与管理,2012,37(5):6-7ZHANG Xiaomei,LV Hongjuan. Current status and prospects of key technologies for safe and efficient construction auxiliary systems for ultra-deep shafts,2012,37(5): 6-7[10] 许雪刚,蒋网丁,李建,等.双联伞钻在大断面立井冻结基岩段施工中应用[J].能源技术与管理,2014,39(3):134-136XU Xuegang,JIANG Wangding,LI Jian,et al. Application of double umbrella drill in the construction of frozen bedrock section of large-section shaft [J]. Energy Technology and Management, 2014, 39(3): 134-136[11] 刘志强,吴玉华,王从平,等.钻井法凿井“一钻成井”工艺[J].建井技术,2011,32(1):8-10LIU Zhiqiang,WU Yuhua,WANG Congping,et al.Drilling method a process of drilling a well[J].Mine Construction Technology,2011,32(1):8-10.[12] 洪伯潜,臧桂茂,谭杰.龙固矿近600m深钻井井壁设计与安装[J].中国煤炭,2004,30(6):9-11HONG Boqian,ZANG Guimao,TAN Jie.Design and installation of sidewall of 600m-deep-well in Longgu mine[J].China Coal,2004,30(6):9-11[13] 牛学超,洪伯潜,杨仁树.充满配重水钻井井壁筒在泥浆中竖向结构稳定的理论研究[J].煤炭学报,2005,30(4):463-466NIU Xuechao,HONG Boqian,YANG Renshu.Theory study on axial structural stability of bored shafts filled with water[J].Journal of China Coal Society,2005,30(4):463-466.[14] 洪伯潜.我国深井快速建井综合技术[J].煤炭科学技术,2006,34(1):8-11HONG Boqian.Comprehensive technology for deep mine rapid construction[J].Coal Science and Technology,2006,34(1):8-11[15] 洪伯潜.再论“钻井井壁在泥浆中的轴向稳定”[J].煤炭学报,2008,33(2):121-125HONG Boqian.Discussion vertical structural stability of a drilled shaft in mud further[J].Journal of China Coal Society,2008,33(2):121-125[16] 姚直书,蔡海兵,程桦,等.特厚表土层钻井井壁底结构分析与设计优化[J].煤炭学报,2009,34(6):747-751YAO Zhishu,CAI Haibing,CHENG Hua,et al.Structure analysis and design optimization of drilling shaft lining bottom in super-deep alluvium[J].Journal of China Coal Society,2009,34(6):747-751[17] 刘志强,宋朝阳,程守业,等.千米级竖井全断面科学钻进装备与关键技术分析[J].煤炭学报,2020,45(11):3645-3656LIU Zhiqiang,SONG Chaoyang,CHENG Shouye,et al.Equipment and key technologies for full-section scientifically drilling of kilometer-level vertical shafts[J].Journal of China Coal Society,2020,45(11):3645-3656[18] 刘志强.竖井掘进机[M].北京:煤炭工业出版社,2019LIU Zhiqiang. Shaft boring machine[M]. Beijing: China Coal Industry Publishing House ,2019[19] 刘志强.反井钻机[M].北京:科学出版社,2017LIU Zhiqiang. Raise Boring Machine [M]. Beijing: Science Press,2017[20] 刘志强,宋朝阳,程守业,等.我国反井钻机钻井技术与装备发展历程及现状[J].煤炭科学技术,2021,49(1):32-65LIU Zhiqiang,SONG Chaoyang,CHENG Shouye,et al.Development history and status quo of raise boring technologies and equipment in China[J].Coal Science and Technology,2021,49(1):32-65[21] 冯旭海.煤矿冻结法与注浆法特殊凿井技术应用对比研究[J].建井技术,2015,36(3):42-46FENG Xuhai.Comparative Study on Freezing Method and Grouting Method of Shaft Construction Technique in Coal Mines[J].Mine Construction Technology,2015,36(3):42-46[22] 洪伯潜.迅速发展的我国特殊凿井技术[A].中国煤炭学会.中国煤炭学会第六次全国会员代表大会暨学术论坛论文集.[C].北京:中国煤炭学会,2007:8.HONG Boqian.Rapidly developing special well-drilling technology in my country [A].China Coal Society.Proceedings of the Sixth National Member Congress and Academic Forum of China Coal Society.[C].Beijing: China Coal Society,2007:8 .[23] 张文.我国冻结法凿井技术的现状与成就[J].建井技术,2012,33(3):4-13ZHANG Wen.Current status and achievements of freezing method well drilling technology in my country [J].Mine Construction Technology,2012,33(3):4-13[24] 冯旭海,赵国栋.立井地面综合注浆技术研究与应用综述[J].建井技术,2012,33(6):8-11FENG Xuhai,ZHAO Guodong.Summary of research and application of vertical shaft ground comprehensive grouting technology[J].Mine Construction Technology.2012(6):8-11.[25] 王鹏越.超大直径深立井施工技术发展及展望[J].煤炭工程,2018,50(6):47-50WANG Pengyue.Development and prospect of construction technique for super-large diameter deep vertical shaft[J].Coal Engineerin,2018,50(6):47-50[26] 杨维好.十年来中国冻结法凿井技术的发展与展望[C].中国煤炭学会.中国煤炭学会成立五十周年高层学术论坛论文集.[C].北京,2012YANG Weihao.Development and prospect of freezing sinking technology in china in the past 10 years[C].China Coal Society.China Coal Society’s 50th Anniversary High-level Academic Forum.[C].Beijing,2012[27] 程桦,彭世龙,荣传新,等.千米深井L型钻孔预注浆加固硐室围岩数值模拟及工程应用[J].岩土力学,2018,39(S2):274-284CHENG Hua,PENG Shilong,RONG Chuanxin,et al.Numerical simulation and engineering application of grouting reinforcement for surrounding rocks of chamber in deep of 1000 m by L-shaped boreholes[J].Rock and Soil Mechanics,2018,39(S2):274-284[28] 牛秀清,王桦,刘书杰.华北煤田下组煤底板岩溶含水层注浆改造技术应用及发展趋势[J].建井技术,2017,38(3):24-30NIU Xiuqing,WANG Hua,LIU Shujie.Application and Development Trends on Grouting Reconstruction Technology for Floor Karst Aquifers of Lower Group Coal Seam in Northern China Coal Field[J].Mine Construction Technology,2017,38(3):24-30[29] 张庆松,张连震,刘人太,等.水泥-水玻璃浆液裂隙注浆扩散的室内试验研究[J].岩土力学,2015,36(8):2159-2168ZHANG Qingsong,ZHANG Lianzhen,LIU Rentai,et al.Laboratory experimental study of cement-silicate slurry diffusion law of crack grouting with dynamic water[J].Rock and Soil Mechanics,2015,36(8):2159-2168[30] 左永江,周兴旺,洪伯潜.立井建设中的钻-注平行作业施工技术[J].煤炭科学技术,2011,39(1):33-36ZUO Yongjiang,ZHOU Xingwang,HONG Boqian.Drilling-Grouting Simultaneous Operation Technology in Mine Shaft Construction[J].Coal Science and Technology,2011,39(1):33-36[31] 李敬周,贺永强.主立井井筒工作面预注浆技术应用[J].煤炭工程,2014,46(9):52-54LI Jingzhou,HE Yongqiang.Application of Pre-Grouting Technology of Working Face in Mine Main Shaft[J].Coal Engineering,2014,46(9):52-54[32] 潘睿,张兵奇.立井高承压水上工作面止浆垫和岩帽设计研究[J].煤炭工程,2014,46(11):27-2932PAN Rui,ZHANG Bingqi.Study on Design of Grouting Pad and Rock Cap at Shaft Sinking Face Above High Pressurized Water in Mine Shaft[J].Coal Engineering,2014,46(11):27-2932[33] 姬刘亭.深立井、大荷载、高速度提升刚性罐道与罐道梁设计选型探讨[J].煤炭工程,2012,44(3):6-8JI Liuting.Discussion on Design Selection of Rigid Cage Guide and Cage Guide Beam for High Load and High Speed Hoisting in Deep Mine Shaft[J].Coal Engineering,2012,44(3):6-8[34] 温洪志,杨福辉,黄成麟.大强煤矿千米立井井筒快速施工技术[J].煤炭工程,2012,44(12):27-29WEN Hongzhi,YANG Fuhui,HUANG Chenglin.Rapid Construction Technology of 1000m Mine Shaft in Daqiang Mine[J].Coal Engineering,2012,44(12):27-29[35] 宋朝阳,纪洪广,孙利辉.高地应力深立井井筒围岩应力演化与变形规律及支护分析[J].煤炭工程,2016,48(10):45-48SONG Chaoyang,JI Hongguang,SUN Lihui.Evolution-deformation law and support of surrounding rock in deep vertical shaft under high ground stress[J].Coal Engineering,2016,48(10):45-48[36] 刘志强,宋朝阳,程守业,等.千米级竖井全断面科学钻进装备与关键技术分析[J].煤炭学报,2020,45(11):3645-3656LIU Zhiqiang,SONG Chaoyang,CHENG Shouye.Equipment and key technologies for full-section scientifically drilling of kilometer-level vertical shafts[J].Journal of China Coal Society,,2020,45(11):3645-3656[37] 李功洲,高伟,李方政.深井冻结法凿井理论与技术新进展[J].建井技术,2020,41(5):10-1429LI Gongzhou,GAO Wei,LI Fangzheng.New Progress of Theory and Technology in Deep Shaft Sinking by Artificial Ground Freezing Method[J].Mine Construction Technology,2020,41(5):10-1429 |