复杂围岩巷道快掘成套装备适配与掘支平行工艺优化

张亚龙,王学兵   

  1. 国家能源集团乌海能源有限责任公司,内蒙古 乌海 016000
  • 收稿日期:2025-05-06 修回日期:2025-11-19 出版日期:2026-08-15 发布日期:2026-08-31
  • 通讯作者: 司建军 E-mail:903817927@qq.com

Adaptation of complete equipment for rapid excavation in roadways with complex surrounding rock and optimization of parallel excavation-support technology#br#

#br#   

  • Received:2025-05-06 Revised:2025-11-19 Online:2026-08-15 Published:2026-08-31
  • Contact: / // E-mail:903817927@qq.com

摘要:

针对乌海能源黄白茨煤矿快速掘进系统应用中“咬架”事故频发、锚护空间不足、掘进效率远未达设计预期的工程难题,通过现场工序工时实测、装备故障机理分析,明确了制约巷道掘进速度提升的核心因素:分组分控自移式联排支架两侧移架行程易出现不同步,频繁引发“咬架”故障;桥式转载机占用巷道作业空间,限制了液压锚杆钻车的机械化支护作业,导致掘支仅能顺序施工,综掘机开机率仅维持在45%~50%。基于上述分析,提出联排支架同步移架防“咬架”声光联动控制技术,以及空间多维度掘支平行施工工艺优化方案。现场应用表明,“咬架”故障被消除,实现了前掘后支、掘支平行作业, 综掘机开机率提升至75%~80%,月进尺由220m提高至350m,掘进工效得到显著提升,可为相似地质条件巷道的快速掘进施工提供借鉴。

关键词: 半煤岩巷道, 快速掘进系统, 自移式联排支架, 掘支平行, 防“咬架”控制

Abstract:

Rapid excavation is an important technical path to solve the problem of imbalanced coal mining. Huangbaici Coal Mine has constructed a rapid excavation system with self moving row support and hydraulic anchor drilling truck as the core. However, there are frequent biting accidents during the support moving process and limited construction space of the hydraulic anchor drilling truck, resulting in low excavation efficiency. Therefore, this article analyzes the key factors that restrict the improvement of tunnel excavation speed and proposes targeted optimization techniques. The results show that the self moving row support is designed as a frame type grouping and control structure, which can easily cause asynchronous movement of the two sides of the support, leading to biting accidents after the vertical beams of the support come into contact and collide; The operating range of the rear bridge type transfer machine encroaches on the construction space of the hydraulic anchor drilling truck, making it impossible to achieve mechanized anchoring operations, resulting in excavation and support still being sequential operations, and the start-up rate of the comprehensive excavation machine is only 45% to 50%. Based on this, the synchronized movement and anti biting frame sound light linkage optimization technology of the row support and the multi-dimensional excavation and support construction process optimization technology in space were proposed, realizing the parallel operation of front excavation and rear support and excavation and support, and increasing the tunnel excavation speed from 220m/month to 350m/month. The research results can provide reference for rapid excavation construction of tunnels under similar conditions.