煤炭工程 ›› 2023, Vol. 55 ›› Issue (2): 12-18.doi: 10.11799/ce202302003

• 设计技术 • 上一篇    下一篇

倾斜煤层半煤岩沿空掘巷合理煤柱宽度留设研究

刘鹏泽1,高林2,许帅1,赵世毫1,战新宇1,申业兴1   

  1. 1. 贵州大学矿业学院
    2. 贵州大学矿业学院;煤炭行业巷道支护与灾害防治工程研究中心;喀斯特地区优势矿产资源高效利用国家地方联合工程实验室;贵州省复杂地质矿山开采安全技术工程中心
  • 收稿日期:2022-10-13 修回日期:2022-11-24 出版日期:2023-02-20 发布日期:2023-03-27
  • 通讯作者: 高林 E-mail:113395965@qq.com

Study on reasonable coal pillar width of coal-rock gob-side entry driving in inclined coal seam

  • Received:2022-10-13 Revised:2022-11-24 Online:2023-02-20 Published:2023-03-27

摘要: 针对倾斜煤层半煤岩沿空掘巷围岩产生非对称大变形的难题,以贵州土城矿1509回风巷为例,进行了该类巷道合理煤柱宽度留设研究。基于极限平衡理论建立了倾斜煤层半煤岩沿空掘巷合理煤柱宽度计算模型,结合该矿实际生产地质条件计算得出煤柱合理理论宽度为4.68~5.46m|通过数值模拟分析了5种不同宽度煤柱下1509回风巷围岩塑性区分布、应力及位移演化规律,模拟结果表明:当煤柱宽度为5m时,巷道稳定性较好且能保证矿井的回采率。现场试验结果显示,1509回风巷采用留设5m宽煤柱进行掘进护巷后,巷道轮廓相对完整,变形明显减小,围岩完整性较好,有利于提高倾斜煤层半煤岩沿空掘巷的稳定性。

关键词: 煤柱宽度, 半煤岩巷道, 沿空掘巷, 倾斜煤层, 围岩控制

Abstract: Aiming at the problem of asymmetric large deformation of surrounding rock caused by unreasonable coal pillar width in gob-side entry driving in inclined coal seam, 1509 return airway of a mine in Guizhou was taken as an example to study the reasonable coal pillar width of this kind of roadway. Based on the limit equilibrium theory, the calculation model of reasonable coal pillar width of coal-rock gob-side entry driving in inclined coal seam is established. Combined with the actual production geological conditions of the mine, the reasonable theoretical width of coal pillar is 4.68~5.46 m. The distribution of plastic zone, stress and displacement evolution of surrounding rock of 1509 return airway under five different widths of coal pillars are analyzed through numerical simulation. It is concluded that when the width of coal pillar is 5m, the stability of roadway is better and the recovery rate of mine can be guaranteed. After comprehensive consideration, it is determined that 5m wide coal pillar should be retained for the subsequent excavation of 1509 return airway. In the industrial test, the results of mine observation and surrounding rock drilling detection in the stable section of the subsequent new excavation support of 1509 return air roadway show that after the roadway is excavated and protected by retaining 5m wide coal pillars, compared with the original design at the same time, the contour of the roadway is relatively complete, the deformation is obviously reduced, the inner wall of the roof and the two sides of the borehole is smooth and there is no collapse hole, and the integrity of the surrounding rock is good, which is conducive to improving the stability of the coal-rock gob-side entry driving in inclined coal seam, and further verifies the reliability of the research results.

中图分类号: