煤炭工程 ›› 2013, Vol. 45 ›› Issue (s1): 45-47.doi: 10.11799/ce201308068

• 施工技术 • 上一篇    下一篇

高能级强夯处理新近堆积深厚填土实例

孙宏   

  1. 大地工程开发(集团)有限公司
  • 收稿日期:2013-04-20 修回日期:2013-05-27 出版日期:2013-08-12 发布日期:2013-08-12
  • 通讯作者: 孙宏 E-mail:sunhong@dadieng.com

Treatment Cases of Recently Accumulated Deep Earth-filled Ground with High Energy Level Dynamic Compaction

  • Received:2013-04-20 Revised:2013-05-27 Online:2013-08-12 Published:2013-08-12

摘要:

摘要:通过工程实例,应用载荷试验、原位测试和沉降观测,验证了高能级强夯处理新近堆积深厚填土的效果。为高能级强夯有效加固深度的确定、地基承载力提高幅度、施工工艺,提供实测资料。

关键词: 关键词:高能级强夯, 新近堆积, 深厚填土, 有效加固深度。

Abstract:

Abstract: This paper utilized engineering cases, loading tests, in-situ tests and settlement observation to verify results of recently accumulated Deep Earth-filled Ground treated by high energy level dynamic compaction. It will provide in-situ measurement data for the definition of the effective reinforcement depth of high energy level dynamic compaction, enhancement of foundation bearing capacity and construction technology.

Key words: Keywords: high energy level dynamic compaction, recently accumulated, Deep Earth-filled Ground, effective reinforcement depth.