煤炭工程 ›› 2013, Vol. 45 ›› Issue (s1): 45-47.doi: 10.11799/ce201308068
• 施工技术 • 上一篇 下一篇
孙宏
收稿日期:
修回日期:
出版日期:
发布日期:
通讯作者:
Received:
Revised:
Online:
Published:
摘要:
摘要:通过工程实例,应用载荷试验、原位测试和沉降观测,验证了高能级强夯处理新近堆积深厚填土的效果。为高能级强夯有效加固深度的确定、地基承载力提高幅度、施工工艺,提供实测资料。
关键词: 关键词:高能级强夯, 新近堆积, 深厚填土, 有效加固深度。
Abstract:
Abstract: This paper utilized engineering cases, loading tests, in-situ tests and settlement observation to verify results of recently accumulated Deep Earth-filled Ground treated by high energy level dynamic compaction. It will provide in-situ measurement data for the definition of the effective reinforcement depth of high energy level dynamic compaction, enhancement of foundation bearing capacity and construction technology.
Key words: Keywords: high energy level dynamic compaction, recently accumulated, Deep Earth-filled Ground, effective reinforcement depth.
中图分类号:
TU472
孙宏. 高能级强夯处理新近堆积深厚填土实例[J]. 煤炭工程, 2013, 45(s1): 45-47.
0 / / 推荐
导出引用管理器 EndNote|Reference Manager|ProCite|BibTeX|RefWorks
链接本文: http://www.coale.com.cn/CN/10.11799/ce201308068
http://www.coale.com.cn/CN/Y2013/V45/Is1/45
参考文献: [ ].行业标准.建筑地基处理技术规范(JGJ79-2002).北京:中国建筑工业出版社,2002 [2].协会标准.强夯地基处理技术规程.中国计划出版社,2010 [3].孔令伟,袁建新.强夯后地基土变形模量与承载力的反演计算[J].岩土工程学报,1999,21(2),153~157。