煤炭工程 ›› 2022, Vol. 54 ›› Issue (8): 42-47.doi: 10.11799/ce202208009

• 施工技术 • 上一篇    下一篇

综放工作面冲击危险性评价及监测防治技术研究

高健勋   

  1. 华能煤炭技术研究有限公司
  • 收稿日期:2022-05-17 修回日期:2022-07-30 出版日期:2022-08-15 发布日期:2022-09-06
  • 通讯作者: 高健勋 E-mail:18227551564@163.com

Rockburst Risk Assessment and Prevention Technology in fully mechanized caving face

  • Received:2022-05-17 Revised:2022-07-30 Online:2022-08-15 Published:2022-09-06

摘要: 为保证青岗坪煤矿4煤工作面回采期间安全作业,以该矿42108综放工作面为工程背景,采用冲击危险综合指数法对工作面冲击危险性进行评价,提出“静载+动载”同时监测的研究思路,并建立区域—局部相结合的冲击地压危险监测预警体系,区域监测采用微震监测系统,局部监测采用钻屑法及电磁辐射监测,以此从时间维度上形成 “综合分析—即时监测预警”;空间维度上形成“区域预测—局部监测—点预测”相结合的监测预警技术方案,并根据42108回采工作面冲击危险因素分析及等级评价结果,遵循冲击地压防治的“强卸压”原则,提出了42108回采工作面预卸压以及主动解危方案:帮部大直径钻孔卸压和底板大直径钻孔卸压,最终以钻屑法对卸压方案进行了效果检验,结果表明以上措施有效消除了42108工作面冲击地压危险性。

关键词: 冲击地压, 综合指数法, 微震监测, 局部监测, 超前卸压, 钻孔卸压

Abstract: Abstract:In order to ensure the safe operation of No. 4 coal face in QINGGANGPING coal mine, taking 42108 fully mechanized top coal caving face in No. 2 mining area as the engineering background, the impact risk of the working face is evaluated based on the impact risk comprehensive index method, the idea of simultaneous monitoring of static load and dynamic load is put forward, and a regional local combined monitoring and early warning system of rock burst risk is established. The regional monitoring adopts microseismic monitoring system, Local detection adopts drilling cuttings method and electromagnetic radiation monitoring, so as to form "comprehensive analysis - real-time monitoring and early warning" from the time dimension; Form a monitoring and early warning technical scheme combining "regional prediction, local monitoring and point prediction" in the spatial dimension, and follow the "strong pressure relief" principle of rock burst prevention and control according to the analysis of impact risk factors and grade evaluation results of 42108 mining face, This paper puts forward the pre pressure relief and active danger relief scheme of 42108 mining working face, including pressure relief of large-diameter borehole in the upper part and pressure relief of large-diameter borehole in the bottom plate. Finally, the effect of the pressure relief scheme is tested by the drilling cuttings method, and the risk of rockburst in 42108 working face is eliminated. It is expected to provide reference for the prevention and control of coal mine rockburst under similar geological conditions.

中图分类号: