煤炭工程 ›› 2023, Vol. 55 ›› Issue (7): 188-192.doi: 10.11799/ce202307031

• 工程管理 • 上一篇    

基于数据库的矿井成本估算模型构建研究

李旭娟   

  1. 中煤西安设计工程有限责任公司,陕西 西安 710054
  • 收稿日期:2022-09-25 修回日期:2022-12-29 出版日期:2023-07-20 发布日期:2025-04-07
  • 通讯作者: 李旭娟 E-mail:lixujuanhn@163.com

Research on the construction of mine cost estimation model based on Database

  • Received:2022-09-25 Revised:2022-12-29 Online:2023-07-20 Published:2025-04-07

摘要:

详细论述了矿井项目成本费用的构成, 系统分析了影响成本费用的主要因素, 提出了总成本和成本科目分别按计算、计提、类比预测方式的估算方法, 为成本费用库的建立、成本估算提供了基础依据。开发了成本费用库、成本估算模型及成本指标分析模型, 构建了集查询、估算、分析为一体的成本费用估算系统, 实现了零散成本费用数据的集中存储、在线查询, 实现了拟建项目成本费用的快速估算, 实现了某个地区、特定生产规模条件下成本指标在线分析等。为矿井项目前期成本估算, 生产运营成本预测提供依据, 为项目事前评价、事中评价及事后评价提供准确数据, 为成本费用水平的合理性提供科学有效的判断依据, 提高了矿井项目成本估算的工作效率, 提升了技术经济工作的专业性和科学性, 为企业决策提供有力支撑, 为行业数字经济发展提供有力保障。

关键词: 矿井项目, 成本费用, 数据库, 成本估算, 成本指标分析

Abstract:

The composition of the cost of the mine project is discussed in detail, the main factors affecting the cost are systematically analyzed, and the estimation method of total cost and cost items according to calculation, calculation and analogy prediction methods are proposed, which provides a basic basis for the establishment and cost estimation of the cost bank. The cost database, cost estimation model and cost index analysis model have been developed, a cost estimation system integrating query, estimation and analysis has been built, the centralized storage and online query of scattered cost data have been realized, the rapid estimation of the cost cost of the proposed project has been realized, and a certain region and specific students have been realized. Online analysis of cost indicators under the condition of production scale. The cost bank, cost estimation model and cost index analysis model are independent and interrelated.It provides the basis for the preliminary cost estimation and production and operation cost prediction of the mine project, provides accurate data for the pre evaluation, in-process evaluation and post evaluation of the project, provides a scientific and effective judgment basis for the rationality of the cost level, improves the work efficiency of the mine project cost estimation, improves the professionalism and scientificity of the technical and economic work, and provides strong support for the enterprise decision-making, Provide a strong guarantee for the development of digital economy in the industry.

中图分类号: