[1]黄庆享.浅埋煤层的矿压特征与浅埋煤层的定义[J]. 岩石力学与工程学报,2002,21(8) :1 174-1 177.HUANG Qingxiang.Ground pressure behavior and definition of shallow seams[J]. Chinese Journal of Rock Mechanics and Engineering,2002,21(8) : 1 174-1 177.[2]张杰,侯忠杰.厚土层浅埋煤层覆岩运动破坏规律研究[J]. 采矿与安全工程学报,2007, 24(1):56-59. ZHANG Jie,HOU Zhongjie.Failure rule of overburden movement in shallowly buried coal seam covered with thick soils[J]. Journal of Mining & Safety Engineering,2007,24(1): 56-59.[3]钱鸣高,缪协兴,何富连.采场“砌体梁”结构的关键块分析[J]. 煤炭学报,1994,19 (6):557-563.QIAN Minggao,MIAO Xiexing,He Fulian. Analysis of key block in the structure of voussoir beam in longwall mining[J]. Journal of China Coal Society, 1994, 19(6): 557-563. [4]黄庆享,钱鸣高,石平五.浅埋煤层采场基本顶周期来压的结构 分析[J]. 煤炭学报,1999,24(6) : 581 -585.HUANG Qingxiang, QIAN Minggao, SHI Pingwu. Structural analysis of main roof stability during periodic weighting in longwall face[J]. Journal of China Coal Society, 1999, 24(6): 581-585. [5]许家林,朱卫兵,王晓振等.浅埋煤层覆岩关键层结构分类[J]. 煤炭学报,2009,34(7): 865-870. XU Jialin, ZHU Weibing, WANG Xiaozhen, et al. Classification of key strata structure of overlying strata in shallow coal seam[J]. Journal of China Coal Society,2009,34(7): 865-870. [6]柴敬,高登彦,王国旺等.厚基岩浅埋大采高加长工作面矿压规律研究[J].采矿与安全工程学报,2009,26(04):437-440.CHA I Jing , GAO Deng-yan , WANG Guo-wang , et al. Study of Ground Pressure Behavio r of an Ex tended Mining Face in a Shallow Seam w ith T hick Bedrock[J]. Journal of Mining & Safety Engineering, 2009,26(04):437-440.[7]XU Qiang , CHEN Juntao, XIAO Ming. Analysis of unsteady seepage field and surrounding rock stability of underground cavern excavation[J]. Tunnelling and Underground Space Technology incorporating Trenchless Technology Research, 2020, 97: 103239. [8]ZHI Qiang Zhang et al. Influence of fault on the surrounding rock stability of a tunnel: Location and thickness[J].Tunnelling and Underground Space Technology incorporating Trenchless Technology Research, 2017,61:1-11.[9]张红柱.迎回采工作面沿空巷道围岩稳定性机理及控制技术研究[J]. 煤炭技术,2014,33(10):123-125.ZHANG Hongzhu. Study on stability mechanism and control technology of surrounding rock in gob-side entry of working face[J]. Coal Technology, 2014, 33(10): 123- 125 .[10]党兴旺.大采高综采工作面回采巷道围岩控制技术研究[D].太原:太原理工大学,2007.DANG Xingwang. Study on surrounding rock control technology of mining roadway in large mining height working face [D]. Taiyuan: Taiyuan University of Technology, 2007.[11]王龙飞,常泽超,杨战标,等. 深井近距离煤层群采空区下回采巷道联合支护技术[J]. 采矿与安全工程学报, 2018, 35 (04):686-692.WANG Longfei, CHANG Zechao, YANG Zhanbiao, et al. Combined support technology of roadway under mined gob of ultra-distance seams in deep mine[J]. Journal of Mining&Safety Engineering. 2018, 35 (04): 686-692.[12]代进,蒋金泉. 上下盘开采顺序对断层煤柱采动应力的影响[J]. 采矿与安全工程学报, 2016, 33 (01):35-41.DAI Jin, JIANG Jin-quan. Influence of mining sequence of hanging wall and foot wall on mining-induced stress of fault coal pillar[J]. Journal of Mining & Safety Engineering, 2016, 33(1): 35-41. [13]杨科,孔祥勇,陆伟,等. 近距离采空区下大倾角厚煤层开采矿压显现规律研究[J]. 岩石力学与工程学报, 2015, 34 (S2): 4278-4285.YANG Ke, KONG Xiangyong, LU Wei, et al. Study of strata pressure behaviors with longwall mining in large inclination and thick coal seam under closed distance mined gob[J]. Chinese Journal of Rock Mechanics and Engineering, 2015, 34(S2):4278-4285[14]张忠温,吴吉南,范明建,等. 近距离煤层采空区下巷道支护技术研究与应用[J]. 煤炭工程, 2015, 47 (02):37-40.ZHANG Zhongwen, WU Jinan, FAN Mingjian, et al. Research on roadway support technology under goaf of close coal seam[J]. Coal Engineering, 2015, 47(2):37-40.[15]刘长友,杨敬轩,于斌,等. 多采空区下坚硬厚层破断顶板群结构的失稳规律[J]. 煤炭学报, 2014, 39(03): 395- 403.LIU Changyou, YANG Jingxuan, YU Bin, et al. Destabilization regularity of hard thick roof group under the multi gob[J]. Journal of China Coal Society, 2014, 39(3):395-403.[16]高建军,张忠温. 平朔矿区近距离煤层采空区下巷道支护技术研究[J]. 煤炭科学技术, 2014, 42(05):1-4+8.GAO Jianjun, ZHANG Zhongwen. Study on support technology of gateway in contiguous seams under mining goaf in Pingshuo mining area[J]. Coal Science and Technology, 2014, 42(5):1-4+8.[17]杨敬轩,刘长友,杨宇,等. 浅埋近距离煤层房柱采空区下顶板承载及房柱尺寸[J]. 中国矿业大学学报, 2013, 42 (02):161-168.YANG Jingxuan, LIU Changyou, YANG Yu. Study of the bearing mechanism of the coal roof and the dimension selection of the room and pillar in the shallow and close distance coal seam[J]. Journal of China University of Mining & Technology, 2013, 42(2):161-168.[18]董宇,谢文兵,荆升国,等. 近距离煤层采空区下回采巷道高强稳定型支护技术[J]. 煤炭科学技术, 2013, 41 (02): 19- 23.DONG Yu, XIE Wenbing, JING Shengguo, et al. High strength stable type support technology of mining gateway under goaf in contiguous seams[J]. Coal Science and Technology, 2013, 41(2):19-23.[19]解兴智.浅埋煤层房柱式采空区下长壁开采矿压显现特征[J].煤炭学报,2012,37(06):898-902.XIE Xingzhi. Study on the characteristics of strata behavior in shallow seam longwall mining under the room-and-pillar mining goaf[J]. Journal of China Coal Society, 2012,37(6):898-902.[20]薛吉胜,范志忠,黄志增.极近距离煤层采空区下工作面两巷合理位置确定[J].煤炭科学技术, 2012,40(04): 37-41.XUE Jisheng, FAN Zhizhong, HUANG Zhizeng. Determination of reasonable positions of two alleys in the lower working face of coal seam goaf in very close proximity[J]. Coal Science and Technology, 2012, 40 (04):37-41.[21]杨真,童兵,黄成成,等.近距离房柱采空区下长壁采场顶板垮落特征研究[J].采矿与安全工程学报, 2012, 29(02): 157-161.YANG Zhen, TONG Bing, HUANG Chengcheng, et al. Study of caving and fracturing over a longwall panel beneath a goaf mined by room and pillar[J].Journal of Mining & Safety Engineering, 2012, 29(02):157-161.[22]屠世浩,窦凤金,万志军,等. 浅埋房柱式采空区下近距离煤层综采顶板控制技术[J]. 煤炭学报, 2011, 36(03): 366- 370.TU Shihao, DOU Fengjin, WAN Zhijun, et al. Strata control technology of the fully mechanized face in shallow coal seam close to the above room-and-pillar gob[J]. Journal of China Coal Society, 2011, 36(3):366- 370.[23]张耀平,曹平,袁海平,等. 复杂采空区稳定性数值模拟分析[J].采矿与安全工程学报, 2010, 27 (02):233-238.ZHANG Yaoping, CAO Ping, YUAN Haiping ,et al. Numerical simulation on stability of complicated goaf [J].Journal of Mining&Safety Engineering, 2010, 27 (02): 233-238.[24]屠世浩,王方田,窦凤金,等. 上层煤柱下综放沿空回采巷道矿压规律研究[J]. 中国矿业大学学报, 2010, 39 (01): 1-5.TU Shihao, WANG Fangtian, DOU Fengjin, et al. Fully mechanized top-coal caving: underground stress at gateways under barrier pillars of an upper coal seams[J].Journal of China University of Mining and Technology, 2010, 39(01):1-5.[25]王树仁,张海清,慎乃齐,等. 下伏采空区桥隧工程变形及受力响应特征分析[J]. 岩石力学与工程学报, 2009, 28(06):1144-1151.WANG Shuren, ZHANG Haiqing, SHEN Naiqi, et al. Analysis of deformation and stress characteristics of highway tunnels above mined-out regions[J]. Chinese Journal of Rock Mechanics and Engineering, 2009, 28 (06):1144-1151.[26]马占国,涂敏,马继刚,等.远距离下保护层开采煤岩体变形特征[J].采矿与安全工程学报,2008(03):253-257.MA Zhanguo, TU Min, MA Jigang, et al. Rock mass deformation characteristics for coal mining at remote lower protective seam[J]. Journal of Mining & Safety Engineering, 2008(03):253-257.[27]成云海,姜福兴,张兴民,等. 微震监测揭示的C型采场空间结构及应力场[J]. 岩石力学与工程学报, 2007 (01): 102-107.CHENG Yunhai, JIANG Fuxing, ZHANG Xingmin, et al. C-shaped strata spatial structure and stress field in longwall face monitored by microseismic monitoring[J]. Chinese Journal of Rock Mechanics and Engineering, 2007 (01):102-107. |