煤炭工程 ›› 2015, Vol. 47 ›› Issue (8): 57-59.doi: 10.11799/ce201508020

• 生产技术 • 上一篇    下一篇

条带开采煤柱长时效应及置换开采方式研究

邵小平,尉迟小骞,张杰,丁自伟   

  1. 西安科技大学
  • 收稿日期:2014-08-29 修回日期:2015-01-05 出版日期:2015-08-12 发布日期:2015-08-19
  • 通讯作者: 丁自伟 E-mail:zwding519@163.com

Study of Long Time Effect and Replacement Mining Method for Coal Pillar in the Strip Mining

  • Received:2014-08-29 Revised:2015-01-05 Online:2015-08-12 Published:2015-08-19

摘要: 陕北榆阳区地方中小煤矿老式房柱式开采煤柱稳定性存在较大安全隐患,可能影响煤柱后期的置换开采,基于此,通过对煤柱长时效应进行分析,指出现阶段“采12留8”窄条带开采煤柱的长期稳定性优于房柱式开采的矩形煤柱,并给出了条带煤柱置换开采的工作面通风方法和充填方式,提出了前进式充填后退式煤柱置换的开采方式,为陕北中小煤矿保水开采煤柱的稳定性及提高回采率提供了一种新思路。

关键词: 条带开采, 保水开采, 煤柱长时效应, 煤柱置换, 前进式充填

Abstract: The old room and pillar mining methods were commonly used by the local medium and small coal mines in Yuyang district of northern Shaanxi province. There is bigger security hidden danger at coal pillar stability, which had affected later replacement mining of coal pillars. Based on the long time effect analysis of coal pillars, the paper pointed that the long-term stability of narrow coal pillar in “mining 12 remaining 8” was better than that of rectangular coal pillar in room and pillar mining. The good stability of strip coal pillar has given the basic condition under the premise of the later guaranteed mining technology and capital in strip mining. On this basis, the paper has given a working face ventilation method of replacement mining, a filling method, and a specific mining way of advancing filling and back coal pillar replacement. The study has provided a kind of mentality for coal pillar stability and increasing the rate of recovery in protecting water mining at northern Shaanxi province, and had a certain significance.

Key words: Protecting water mining, strip coal pillar, coal pillar replacement, advancing filling

中图分类号: