煤炭工程 ›› 2026, Vol. 58 ›› Issue (4): 10-18.doi: 10.11799/ce202604002

• 设计技术 • 上一篇    下一篇

沙梁煤矿连采连充矸石固体充填注浆工艺优化设计

刘 辉,罗南洪,郭建平,杜超杰,宋宇晨,赵文华   

  1. 1. 陕西涌鑫矿业有限责任公司,陕西 榆林 719000

    2. 陕西涌鑫矿业有限责任公司 沙梁煤矿,陕西 榆林 719000

    3. 中煤科工开采研究院有限公司,北京 100013

  • 收稿日期:2025-09-08 修回日期:2025-11-17 出版日期:2026-04-10 发布日期:2026-05-12
  • 通讯作者: 赵文华 E-mail:m18811773187@163.com

Optimization design of the continuous mining and continuous backfilling with gangue solid backfill-grouting process in Shaliang Coal Mine #br#

  • Received:2025-09-08 Revised:2025-11-17 Online:2026-04-10 Published:2026-05-12

摘要:

连采连充工艺可实现采-充平行作业,工作面设计灵活,对回收不规则块段煤炭资源具有显著优势。沙梁煤矿为了回收不规则煤炭资源以及处理矸石固废,采用连采连充矸石固体充填注浆工艺。对比了全采全充、局采局充两套工艺,综合比较选择局采局充工艺。工作面长度控制在100m以内,支巷宽度按6m设计,其中采-充宽度为4.5m,留设1.5m煤柱。在支巷顶板挂设注浆管路,矸石固体充填完成后进行注浆,提高矸石充填体整体强度与稳定性。设计了充填系统与矸石固体充填-注浆工艺流程,优选了采煤与充填设备。开展了注浆材料流动性与强度测试,确定了注浆材料成分配比与合理浓度;结合注浆后矸石胶结体压缩特性,选用连续级配矸石进行充填。

关键词:

连采连充, 矸石固体充填, 工艺设计, 注浆材料配比, 矸石级配

Abstract:

The continuous mining and continuous filling process allows for parallel mining and filling operations, with flexible working face design, and has significant advantages in recovering irregular block coal resources. In order to recover irregular coal resources and dispose of gangue solid waste, Shaliang Coal Mine adopted the continuous mining and continuous gangue solid filling-grouting process. After comparing the two processes of full mining and full filling, and, partial mining and partial filling, the partial mining and partial filling process was selected. The length of the working face was controlled within 100 meters, and the width of the branch roadway was designed to be 6 meters, with a mining-filling width of 4.5 meters and a 1.5-meter coal pillar reserved. Grouting pipelines were hung on the roof of the branch roadway, and grouting was carried out after the solid gangue filling was completed to improve the overall strength and stability of the gangue backfill. The filling system and the process flow of solid gangue filling-grouting were designed, and the coal mining and filling equipment were optimized. Tests on the fluidity and strength of grouting materials were carried out, and the composition ratio and reasonable concentration of grouting materials were determined. Considering the compression characteristics of the gangue cementitious body after grouting, continuously graded gangue was selected for filling. This process achieved safe and efficient recovery of irregular coal blocks and comprehensive utilization of gangue.