COAL ENGINEERING ›› 2014, Vol. 46 ›› Issue (2): 71-74.doi: 10.11799/ce201402025
Previous Articles Next Articles
Received:
Revised:
Online:
Published:
Abstract:
The geological condition of the large dip angle and mining height face in Yang Chang Wan coal mine is complicated. The stability of Roof-Support-Pillar system trouble the mining safety, economic concentration and high-efficient. This paper synthesizes the geological condition and features, using FLAC3D simulation software simulate the stress distribution and evolvement laws of up and down ends, roof and pillar stress characteristic of up and down roadway, macro deformation features. The results show: with the roof collapse in mining disturbance area, the major mechanics parameters in “Roof-Support-Pillar” system has changed, and stress has redistributed, the ahead stress peak value of pillar and the range of stress reducing area is different.
Key words: complicated surrounding rock, large mining height, R-S-P stability, numerical simulation
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: http://www.coale.com.cn/EN/10.11799/ce201402025
http://www.coale.com.cn/EN/Y2014/V46/I2/71
[1] 伍永平.“顶板-支护-底板”系统动态稳定性控制模式[J],煤炭学报,2007,32(4):341-346 [2] 王金安,韦文兵,冯锦艳.综放异形煤柱沿空留巷围岩松动圈演化与控制[J],煤炭科学技术,2005,33(5):42-45 [3] 蔡美峰,来兴平,任奋华.西天河下大尺度采空区覆岩断裂规律现场监测研究[D],第八次全国岩石力学与工程学术大会论文集,2003,843-846 [4] 康红普.回采巷道锚杆支护影响因素的FLAC分析[J],岩石力学与工程学报,1999,18(5):632-635 [5] 宋振骐,卢国志,夏洪春.一种计算采场支承压力分布的新算法[J],山东科技大学学报,2006,25(1):1-4