[1] 姜耀东,赵毅鑫,刘文岗,等.煤岩冲击失稳的机制和实验研究[M].北京:科学出版社, 2009:2–27.
[2]JIANG Y D,WANG H W,XUE S,et al.Assessment and mitigation of coal bump risk during extraction of an island longwall panel[J].International Journal of Coal Geology, 2012, 95(1):20-33
[3] MOHAMED K M.Design considerations for longwall yield pillar stability [D] . West Virginia: West Virginia University, 2003
[4]王学滨.不同强度岩石的破坏过程及声发射数值模拟[J].北京科技大学学报, 2008, 30(8):837-843
[5] 徐芝纶.弹性力学[M]. 北京:高等教育出版社,2006:1–71.
[6]蒋承林, 俞启香.煤与瓦斯突出过程中能量耗散规律的研究[J].煤炭学报, 1996, 21(2):173-178
[7] 赵毅鑫, 姜耀东, 王宏伟等.小康矿极软岩回采巷道矿压特征及互补支护设计.第四届全国煤炭工业生产一线青年技术创新文集, 2009, 147-154
[8]赵丽明, 潘启新, 王宏伟等.煤矿软岩巷道支护技术研究[J].中国矿业, 2008, 17(4):79-82
[9]HongweiWang, BrettA.Poulsen,Baotangshen,ShengXue,Yaodongjiang[J].The influence of roadway baekfill on coal Pillar strength by numerical investigation.International Journal of Roek Mechanies & Mining Scienees, 2010, 48(3):443-450