Coal Engineering ›› 2019, Vol. 51 ›› Issue (7): 62-66.doi: 10.11799/ce201907014
Previous Articles Next Articles
Received:
Revised:
Online:
Published:
Abstract: In order to solve the problems of slow moving speed, unbalanced force between front and rear pillars, and poor adaptability to electro-hydraulic control system in the process of using ZF10000/23/37 four-pillar support and shield caving support in 4107 fully mechanized coal face, the characteristics of two-pillar shield caving hydraulic support are studied, and according to coal seam geology in mine. Under the condition and mining technology, ZFY12000/23/40D two-pillar shielded low-level caving support is selected in 4108 fully mechanized caving face. The adaptability of two-pillar caving support in 4108 fully mechanized caving face is better than that of four-pillar caving support in terms of working face moving time, caving time, resource recovery rate, support safety valve opening rate, support overhaul and support sheet side condition.
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: http://www.coale.com.cn/EN/10.11799/ce201907014
http://www.coale.com.cn/EN/Y2019/V51/I7/62