[an error occurred while processing this directive]

Coal Engineering ›› 2025, Vol. 57 ›› Issue (7): 87-94.doi: 10.11799/ce202507013

Previous Articles     Next Articles

Hard roof control technology under residual coal pillar through hydraulic fracturing with long directional borehole

  

  • Received:2024-12-09 Revised:2025-04-14 Online:2025-07-11 Published:2025-08-14

CLC Number: