茹忠亮,冯夏庭,李洪东等.大型地下工程三维弹塑性并行有限元分析[J].岩石力学与工程学报,2006 (06) : 1141 ~ 1146.RU Zhongliang1,FENG Xiating1,2,LI Hongdong1,et al.3D ELASTOPLASTIC PARALLEL FINITE ELEMENT ANALYSIS OF LARGE-SCALE UNDERGROUND ENGINEERING.Chinese Journal of Rock Mechanics and Engineering,2006 (06) : 1141~1146.
[2]
张程林,周小文.砂土颗粒三维形状模拟离散元算法研究[J].岩土工程学报,2015 (S1) : 115~119.ZHANG Cheng-lin;ZHOU Xiao-wen.Algorithm for modelling three-dimensional shape of sand based on discrete element method.Chinese Journal of Geotechnical Engineering,2015 (S1) : 115~119.
[3]
李志清,胡瑞林,林杜军,等.平朔东露天煤矿精煤槽仓高边坡稳定性评价研究报告[R].北京,2011(06).Li Zhiqing,Hu Ruilin,Lin Dujun,et al.Research Report ofStability Evaluation for High Slope of Coal Mine of Dong Lutian inShuozhou.Beijing,2011(06).
[4]
苏朝勇,都静娜,刘 博,等.山西平朔东露天煤矿槽仓三维有限元力学分析数值模拟技术报告[R].北京,2011(10).Su Zhaoyong,Du Jingna,Liu Bo,et al. Technical report on 3-d FEM mechanical analysis of Coal Bunker in Dong Loutian Coal Mine.Beijing,2011(10).
[5]
姜海波,宫守才,刘庆雪.东露天选煤厂槽仓高边坡稳定性与变形分析[J].中国工程科学,2012(02): 107~112.Jiang Haibo,Gong Shoucai,Liu Qingxue.Stability and deformation analysis of high slope for tank-type of bunker at Donglutian coal mine.Engineering science in China,2012 (02) : 107~112.
[6]
李志清,林杜军,岳锐强,等.东露天槽仓黄土高边坡开挖支护变形分析[J].工程地质学报,2013(04):634~640.LI Zhiqing,LIN Dujun,YUE Ruiqiang.DEFORMATION ANALYSIS OF EXCAVATION AND SUPPORTING ON LO-ESS HIGH SLOPE OF COAL BUNKER IN DONG LOUTIAN COAL MINE mine.Journal of Engineering Geology,2013(04) : 634~640.
[7]
中煤西安设计工程有限责任.平朔煤炭工业公司东露天煤矿选煤厂产品煤槽仓岩土工程勘察报告[R].2008.12.CHINA COAL Xi’an DESIGNEERING CO.,LTD .The geotechnical engineering survey report on coal preparation site slot warehouse of east open coal mine belonged to China Coal Pingshuo Coal Co.,Ltd[R].2008.12.
[8]
Chen Houqun , Ma Huaifa , Tu Jin , et al.Parallel computation of seismic analysis of high arch dam[J]. EARTHQUAKE ENGINEERING AND ENGINEERING VIBRATION, 2008(03):1~11.