Study of design method for strip-mining under buildings
2012, 44(11):  10-12.  doi:
Abstract ( 571 )   PDF (476KB) ( 612 )  
References | Related Articles | Metrics
In order to maximize the exploitation of coal resources under the building and protect against exploitation of ground-level structures destroyed. In this paper, Zhaoyang mine, for example, the program about the coal mining under the building was studied. According to geological and mining conditions, the coal pillars were designed to protect the building surface ,and in order to protect the coal resources within the coal pillar ,the strip mining program were designed on the basis of ensuring the stability of coal pillar and recovery rates ,the stay wide and the layout to strip mining were determined, using probability-integral method to calculate the size of surface movement and deformation after the strip mining Studies have shown that the design of strip mining programs can effectively protect the surface structures, and increasing recovery ratio while ensuring building safety, and for the mining of coal under the Zhaoyang building find a technically feasible and economically reasonable method.
Separation technology of the middings upgrading
2012, 44(11):  13-14.  doi:
Abstract ( 581 )   PDF (381KB) ( 515 )  
Related Articles | Metrics
The recleaning of middings is an effective means to protect scarce coal such as coking coal, fat coal, etc. Seven typical recleaning techniques and their characteristics were introduced, and it has important directive to production practices.
Analysis on Surrounding Roadway Stability of Large Cross-Section Open-off Cut Support Release Effect
2012, 44(11):  17-19.  doi:
Abstract ( 461 )   PDF (774KB) ( 631 )  
References | Related Articles | Metrics
The bolt-net support technology has good effect in big cross-section open-off cut of fully mechanized top coal caving mining face, but as a result of bolt and cable suspension, the roof can not collapse timely, it caused a certain impact on the vicinal tunnel stability, aiming at solving this problem, by means of theory , numerical simulation and site observation, the effect to coal pillar supporting stress and wall rock deformation of bolt-net release in fully mechanized top coal caving is analysed. The results show that open-off cut bolt-net release can make the roof collapse along with work face advance, shorten old roof 1st collapse distance, decrease coal pillar stress between drainage tunnel and open-off cut, reduce drainage tunnel deformation, is conducive to the drainage tunnel stability controlling. This paper conclusion has a significant reference meaning to direct tunnel deformation controlling around the goaf.
STUDY OF LET EQUILIBRIUM PRESSURE STRENGTHENING TECHNOLOGY OF DEEP HIGH STRESS SOFT ROCK ROADWAY
2012, 44(11):  20-22.  doi:
Abstract ( 567 )   PDF (675KB) ( 942 )  
Related Articles | Metrics
The support for high-stress Soft Rock Roadway was a little difficult in deep mine. The stability of surrounding rock was hard to be controlled in traditional supporting ways. According to the Characteristics of Deformation and Failure and Geological Conditions in deep mine railway laneway of Yun Jia-ling mine. Based on the theory analysis. It was put forward that support of let equilibrium pressure concept. That is realizing the whole section’s bolt and anchor equilibrium condition of forces by something. The comprehensive supporting way of Cable Anchor tunnel yield support at first time and grouting reinforcement at the second time was designed. The industrial test shows that arch roadway’s shoulder bolt and anchor roadway yield link first let pressure deformation and then transfer to top. Anchor let pressure for 15 t extreme, extreme pressure for 18t to bolt. Results show that the deformation and failure of the south railway roadway be effectively controlled.
Applied Research of Loose-presplitting Blasting Technique in Hard Rock of Comprehensive Excavation Roadway
2012, 44(11):  32-33.  doi:
Abstract ( 566 )   PDF (535KB) ( 452 )  
Related Articles | Metrics
In view of the comprehensive digging in hard rock, such as low cutting efficiency, large consumption of pick and slow excavation speed but the cost increasing, puts forward a new the construction scheme of deep-hole loose-presplit blasting first, and then cut by roadheader. According to lithologic character, on the basis of theoretical analysis and calculation, deep-hole blasting parameters is designed and implement. Crack test results of different depth show that length of radial crack is around 300 to 400 mm, rock damaged and overall intensity decreased, conducive for roadheader cutting; on average, footage of each group can be increased 0.4 to 0.6m, cutting speed increased by 20% to 40%, pick consumption reduced 30 to 40%. At the same time, reducing dust, improving working environment, experimental research achieved good effect.
Practice of gob-side entry retaining with Y model ventilation in fully mechanized coal face 1311(1)
2012, 44(11):  37-39.  doi:
Abstract ( 478 )   PDF (459KB) ( 806 )  
References | Related Articles | Metrics
Gob-side entry retaining is an extremely complex engineering technology. Before mining in working face 1311(1) Mine Ding-ji ,in order to ensure success of entry reaining, a detailed implementation plan was developed. But in site actual situation, confining pressure appear seriously, roof and floor shift is about 3000mm, loss of anchor cable is serious, a lot of single prop crush, local roadway has width less than 2m, and monomer can not adjust the recovery. With advancing of the working face, the maintenance line become more longer, and can not guarantee the section of above 2㎡. The above situation cannot guarantee the minging safety of working faces without possibility of equipement entering to control gas and carbon monoxide. The origin scheme was adjusted according to site actual situation,has acquired a very good effect, which ensured the mining of the working face safely and orderly.
Comprehensive outburst prevention technology in No.4331 coal mine drilling working face at Jinneng Branch
2012, 44(11):  40-42.  doi:
Abstract ( 513 )   PDF (471KB) ( 644 )  
References | Related Articles | Metrics
No.4331 coal face of Jinneng Coal Industry Branch is coal and gas outburst face, and its geologic structure is complicated. In order to prevent coal and gas outburst in No.4331 rock cross-cut coal uncovering and Tunneling process, comprehensive outburst prevention technology is studied.Before rock cross-cut coal uncovering and coal tunneling, method of druing index is used to forecast the coal-outburst.And protection layer mining, advanced borchole for methane drainage, hydraulic flushing, gas pre-drainage hole and forced air self rescue device are adopted to Prevent coal and gas outburst.And then, effect test and region verification should be implemented until there is no outburst risk in working face.
Application research on relief gas drainage technique in top slicing coal face of single seam with low permeability
2012, 44(11):  43-45.  doi:
Abstract ( 474 )   PDF (761KB) ( 584 )  
References | Related Articles | Metrics
Abstract:The relaxation zone is formed 10 meters in front of the working face because of mining. To some extent, the objective condition which coal seam permeability and porosity in relaxation zone indirectly provides favorable conditions for gas extraction. In this paper, taking the 31021 fully mechanized mining face in Hebi Zhongtai Mining in Henan for example, the gas drainage in pressure releasing area is studied under the mining effect. A remarkable effect has been obtained by relief gas drainage technique in top slicing coal face of single seam with low permeability, based on the gas extraction data analysis.
The Study and Application of Trough FWS flotation machine
2012, 44(11):  46-47.  doi:
Abstract ( 418 )   PDF (348KB) ( 537 )  
References | Related Articles | Metrics
The principle and structure of trough FWS flotation machine were introduced in this paper. The advantages and improvements of it to FWS3000 flotation machine were pointed out. Compared with XJX—T12 flotation machine , it has a higher throughput, a smaller volume, a higher clean coal yield, and a lower energy consumption.
Research and application of newly dedusting technology for roadheader in Pan san mine
2012, 44(11):  51-52.  doi:
Abstract ( 373 )   PDF (633KB) ( 864 )  
References | Related Articles | Metrics
In recent years, with the sharp promotion of mechanization strength, dust hazard of Pan San mine is increasingly serious, therefore, the author makes a deep research on the mechanism of producing dust in heading face, and then adopts froth dust suppression to reduce dust concentration in heading face through designing the technological process and installation system of froth dust,test results show that the all-dust can be reduced to 72.4% and respiratory dust was also to reduced to 75.2%, which was 2.52 times and 3.08 times respectively than that of water spray, and dust concentration is also accordingly reduced from 1103mg/m3 (all dust) and 596mg/m3 (respiratory dust) to 308.8mg/m3 and 149mg/m3 ,the dust effect is very apparent, and at the same time, cost of foam dust is also rather low, only accounts for about 1.8% ~ 2.2% of total inputs, the economy is obvious, which has great practical extension.It’s certainly that the new dust suppression method has a wide prospect in use.
APPLYING FULL-FLOW SEPARATION TO TREAT MINE WATER IN THE FRIST MINE OF PINGDINGSHAN TIANAN COAL MINING CO.,LTD
2012, 44(11):  53-55.  doi:
Abstract ( 515 )   PDF (497KB) ( 626 )  
Related Articles | Metrics
An Full-flow separation was used to deal with the mine water of the frist mine of Pingdingshan Tianan Coal Mining Co., Ltd. Commissioning and operation results show that the processing load is high, the water turbidity is low, shock resistant capability with large changes in the quantity and quality of mine water, while the process is a small footprint and flexible set , post-maintenance is relatively simple, the export water quality can reach 《Standards for Drinking Water Quality》 (GB 5749-2006).
The factor analysis of protective effect with the protected seam during the process of long-distance lower protective seam mining
2012, 44(11):  56-59.  doi:
Abstract ( 452 )   PDF (603KB) ( 903 )  
References | Related Articles | Metrics
Abstract: During the process of long-distance lower protective seam mining . There are many factors for the protective effect with the protected seam .Using numerical simulation method, we analyzed that key layer position in overlying rock body 、the inclined length along the working face 、the inclined angle with the mine seam、the thickness of the mining seam have certain influence on the protective effect of protected seam during the process of long-distance lower protective seam mining .By the four factors , we studied the regulation of stress distribution, expansive deformation of the protected seam during the the process of long-distance lower protective seam mining. Results indicate that the more closer the key layer sites to the protective seam , the longer the length of the working face is , the smaller the inclined angle is ,the thicker the thickness of mining seam, the better protective effect of the protected seam shows .
Study on Stability of the Face Pillar Based on Micro Seismic Monitoring System
2012, 44(11):  64-67.  doi:
Abstract ( 462 )   PDF (1567KB) ( 516 )  
Related Articles | Metrics
In order to monitor movement of roof rock in Liyazhuang Mine deep mining area, setting up SOS micro seismic monitoring system, adopting “D value theory”and build 11 monitoring networks in Liyazhuang Mine deep mining area, provide the method to wave velocity determination, and research overlying strata movement in Liyazhuang Mine deep mining area. The results show that under high stress and mining influence situation, there are a lot of microseism incidents in the pillar and roof. IndicatingtThe face pillar is not steady. According to layered structure of overlying strata, construct a mechanical model of the pillar and roof; analyze damage mechanism of the pillar and roof. Using micro seismic monitoring system monitored the activity of pillar and roof, and evaluate stability of the face pillar.
Study of Floor Heave of Large Section Roadway under Complex Surrounding-Rock Environment
2012, 44(11):  68-71.  doi:
Abstract ( 505 )   PDF (1116KB) ( 691 )  
References | Related Articles | Metrics
Floor heave is one of the main features of roadway damage under complex surrounding-rock environment. The finite difference procedure FLAC3D is used to simulate floor heave of auxiliary haulage roadway at fully mechanized face 110202 in Qingshuiying coal mine, and the laws of deformation and movement and stress distribution around the roadway are obtained. And the mechanical mechanism of floor heave is proved as follow: the bearing arch structure is formed in roof after roadway extraction, through which the load of overlying rock is transmitted to sides of roadway with stress concentration. Under constraint of concentrated stress of sides, the active and passive plastic zones are formed by horizontal compressive stress in floor. When the surrounding rock pressure of floor in passive plastic zone exceeds its strength, stress instability of floor is caused and floor heave is formed. In addition, the roof-sides-floor system structure support pattern is proposed for controlling floor heave of roadway under complex surrounding-rock environment. The experiment of this support method shows that good effect of floor heave controlling is obtained with good technical and economical performances.
Research on squeezing deformation mechanics characteristic and control method of kilometers deep soft roadway
2012, 44(11):  72-74.  doi:
Abstract ( 463 )   PDF (725KB) ( 863 )  
References | Related Articles | Metrics
In order to study the squeezing deformation mechanics characteristics and control measures of kilometers deep mine soft roadway, the research was carried out based on the project of 906m east wing rail roadway in Huainan Zhu Ji coal mine, a typical kilometers deep high stress soft roadway whose surrounding rock produced strong squeezing deformation after excavation. Through the in-situ stress testing and indoor rock mechanics test to obtain mechanical parameters of the surrounding rock, according to Hoek squeezing deformation grade curve to detect the deformation of roadway is very serious squeezing deformation; through Phase2 finite element numerical simulation to analyze the stability of surrounding rock of the roadway, the calculation results show that the deformation and failure is very serious after excavation, the crown displacement and the floor heave amount is very large, which is consistent with the site phenomenon. Based on the deep rock roadway surrounding rock stability control and the theory of ’step by step combined supporting’ concept, direct at squeezing deformation characteristics of the roadway, the dominant thought of corresponding supporting scheme is to enhance the strength of surrounding rock and the deformation resistance ability of the supporting structure, with particular emphasis on floor support. Through the finite element numerical calculation analysis and site monitoring verification, evaluation of the supporting strength of the system, the results show that the proposed scheme of supporting achieved good effect, can control the squeezing deformation effectively.
Research on “two-zone” Height Expected Formula of Sublevel Full-Mechanized Sublevel Caving Mining
2012, 44(11):  75-78.  doi:
Abstract ( 487 )   PDF (513KB) ( 751 )  
References | Related Articles | Metrics
Abstract: There is not ”two-zone” height expected formula for sublevel full-mechanized caving mining in current coal mining regulations.Through collection and statistical analysis about ”two-zone” height measured data of many mining area .Get the ”two-zone” height expected formula which are appropriate for fully-mechanized sublevel caving mining face. Then do the linear relationship significant test and reliability analysis.finally,The applicability of the empirical formula was verified.
Study on the endometrial control of permanent magnet synchronous motor
2012, 44(11):  79-81.  doi:
Abstract ( 461 )   PDF (700KB) ( 740 )  
References | Related Articles | Metrics
Abstract: Permanent magnet synchronous motor mathematical model of the characteristics of the nonlinear and strong coupling, for the deficiencies of the traditional permanent magnet synchronous motor vector control system, this paper proposes a combination of high performance permanent magnet based on the intima of the control principle and space vector algorithmdecoupling of the synchronous motor control method. Endometrial control of the basic principles, the design of permanent magnet synchronous motor closed-loop endometrial controller. Simulation analysis, based on endometrial control of permanent magnet synchronous motor control system based on Matlab / Simulink simulation platform, and finally through experimental verification of the correctness and effectiveness of control methods.
Study on Fault Integrative Line Selection Based on Complex Wavelet Of Resonance-grounding System
2012, 44(11):  82-84.  doi:
Abstract ( 518 )   PDF (1169KB) ( 593 )  
References | Related Articles | Metrics
Most traditional methods of fault line selection are based on the case, that the fault occurred when the phase voltage passed the peak value, while a few methods are providing according the case of the phase voltage passed zero. However, because the different of fault occurred time, the characters of fault singles are very differently, so one method can’t suit for two situation well. This article accord to the different characters of different fault time, putting forward a integrated method which using both of transient zero-sequence current and attenuating direct current, and through MATLAB simulation proving this method is credible.
Reinforcement mechanism and Numerical analysis of Stripgrouting for Mining goaf
2012, 44(11):  85-88.  doi:
Abstract ( 420 )   PDF (1747KB) ( 747 )  
References | Related Articles | Metrics
Grouting Treatment has become the important means to solve the problem of foundation stability above the goaf, Combined with grouting mechanism and strip mining theory, do further study on scope of application, model, mechanism and related parameters of the strip grouting which can control the residual deformation. Comparison and analysis research of settlement deformation and vertical stress for pre-and post of strip grouting and building founded. The results showed that by premise of layout the strip grouting width, space between boreholes and grouting technology properly, strip grouting can control the residual deformation effectively, thus ensuring the safe use of buildings above goaf.
Safety Assessment for Hydraulic Support Based on FAHP
2012, 44(11):  89-92.  doi:
Abstract ( 474 )   PDF (504KB) ( 665 )  
References | Related Articles | Metrics
At present,in the application and research of hydraulic support, an effective evaluation method,which can reflects the safety status and level of hydraulic support on demand,and provide theoretical basis for safety management personnel of hydraulic support is absent.In this thesis,a safety assessment model for hydraulic support is set up based on putting fuzzy comprehensive evaluation and AHP(Analytic Hierarchy Process)together,and a combination of qualitative and quantitative level analysis method was used to determine the weight of each factor in the indicator system,which can evaluate qualitatively and quantitatively safety of hydraulic support in-service. Through a safety analysis and assessment on hydraulic support,the result of assessment is in accord with the practical situation of hydraulic support.
The Fatigue Strength Analysis of The Spiral coal sampling device’s Spiral drill
2012, 44(11):  93-94.  doi:
Abstract ( 522 )   PDF (835KB) ( 627 )  
References | Related Articles | Metrics
The Spiral coal sampling device was studied , and the dynamics model of sampling device was established .According to Sampling device’spiral drill,the finite element model was established,and the virtual fatigue simulation analysis was made for model by using ANSYS. The predicted fatigue life of the component, life safety factor, dangerous parts and other information was obtained. So the force ,reliability ,fatigue life and other situation of the component was quikly determined; the product design cycle was shortened and the service life of parts was improved.
Research on the synthesis process of new polycarboxylic acid dispersants coal water slurry
2012, 44(11):  99-101.  doi:
Abstract ( 493 )   PDF (586KB) ( 699 )  
Related Articles | Metrics
Abstract: In this thesis, based on the Methyl-2-buten-1-ol polyoxyethylene、maleic anhydride and Sodium 2-Methyl-2-propene-1-sulfonate as the raw material, potassium peroxydisufate as the initiator, a new polycarboxylic acid dispersants coal water slurry was synthetized with the free radical polymerization in the water. The paper investigated the temperature, the monomer-proportion, the dosage of the potassium peroxydisulfate, the dosage of the Sodium 2-Methyl-2-propene-1-sulfonate, the reaction times affected to the performances of the dispersant. The experiment results showed that the best conditions of the synthesis of dispersant would be that the monomer-proportion of the the methyl-2-buten-1-ol polyoxyethylene、maleic anhydride and the Sodium 2-Methyl-2-propene-1-sulfonate is 1.0:2.0:0.3, the potassium peroxydisulfate content of the initiator is 4%, the reaction temperature is 80℃ and the reaction time was 80min. Preparation of 66% of the concentration of coal water slurry,the maximum amount of dispersant is 5%.
Sensitive Index Detetmination for Coal and Gas Outburst Prediction on Drivage Face of Liang Bei Mine
2012, 44(11):  102-104.  doi:
Abstract ( 499 )   PDF (467KB) ( 573 )  
References | Related Articles | Metrics
Abstract:In order to improve the quality of work the Liangbei coal outburst prevention, through laboratory measurement and test, and the site tese combined research means, obtained sensitive indicators and their threshold Liangbei underground tunneling face. The results showed that: Heading Face-sensitive indicators to predict no outstanding accuracy rate of 100 percent, the study identified indicators and threshold is reasonable and effective.
A discussion of the Revising method of Coalbed Gas content
2012, 44(11):  105-108.  doi:
Abstract ( 556 )   PDF (512KB) ( 650 )  
References | Related Articles | Metrics
Two kinds of method which including direct measurement method and geological prospecting method are used to measuring the gas content of the coal which in different depth and drilling during the geological exploration. Based on the data from geological prospecting method, using the direct measurement method of gas content for its verification, a practical revising method is established for gas content in coal seam of geological exploration period. The method has been field-proven through prospecting the coal seam gas content of JinSha county HuaJue coalfield. The average gas content in coal seam of geological period has been determined. So it can provide the reliable basis for assessment on risk of coal and gas outburst and evaluation of coalbed methane resource before coalfield construction.
The Analysis of Hydraulic Cutting Seam Based on ABAQUS
2012, 44(11):  109-111.  doi:
Abstract ( 426 )   PDF (1128KB) ( 713 )  
Related Articles | Metrics
Using ABAQUS software to build hydraulic cutting seam model, simulation the internal stress field, displacement, coal gas seepage and the gas pressure distribution of hydraulic cutting seam. Taking a face that 5 meters distance to the drivage face as the research object, processing the analog data, obtained the coal stress, displacement and pore pressure variation at different distance to slotted center in the Y direction.
Experimental study on the sign gas and index system of the pyrophoricity in the yangwangou coal
2012, 44(11):  112-114.  doi:
Abstract ( 427 )   PDF (497KB) ( 815 )  
References | Related Articles | Metrics
The NO. 6 coal seams in the yangwangou coal are class Ⅰ easy spontaneous combustion coal. Through the experimental of spontaneous combustion temperature-programmed, the paper gives the curves of CO,CH4,C2H4 and C2H6 concentration and oxygen consumption rate. By analyzing the curves, it definites the primary sign gas of yangwangou coal mine is CO, and the aid sign gas is C2H4 and C2H6.Based on this conclusion, it builds the index system of the pyrophoricity sign gas in yangwangou coal. It gives the discriminate parameter of the sign gas of coal spontaneous oxidation by the release of CO. The paper provides a reliable basis for the safety measures of spontaneous combustion in yangwangou coal caving face goaf.
Application of the CCHP in Deep Mine Heat Hazard Control
2012, 44(11):  118-120.  doi:
Abstract ( 570 )   PDF (501KB) ( 657 )  
Related Articles | Metrics
Due to the characteristics of high gas, high geothermal temperature and high strength development in Huai-nan mine area, thermal hazard problem has become more and more serious and also affects safety and productivity in coal mine. The CCHP (combined cooling heating and power), as a new mode to control thermal hazard, is put forward after advantages and disadvantages of all kinds of cooling methods are investigated. The CCHP method not only takes full advantage of gas but also reduces the greenhouse gas emission. At the same time, the application of CCHP remits the pressure of the power supply in summer, providing guarantee for safe and high efficiency exploitation.
Design of Fire Source Monitoring System for Mine Based on WSN
2012, 44(11):  121-123.  doi:
Abstract ( 641 )   PDF (507KB) ( 584 )  
References | Related Articles | Metrics
For the monitoring and location problem of the mine fire source, a monitoring scheme based on WSN is proposed in this paper. The topology of the network structure is the mesh type. The cluster head is selected by means of competitive learning method and the cover configuration protocol is employed to reduce the energy consumption and the information redundancy. RSSI approach is used as the node positioning mechanism to measure the distance among nodes. And maximum likelihood estimation method is adopted to figure out the node position. Considering the actual situation of the mine, the least square method is proposed for data fitting and to establish RSSI model.
A multi-functional drilling frame development
2012, 44(11):  124-125.  doi:
Abstract ( 519 )   PDF (542KB) ( 581 )  
References | Related Articles | Metrics
Coal mine roadway development process, dig anchor imbalance causes the mine into the lane speed is low, through the analysis and research of single pneumatic roof bolter, its performance is one of the main reasons causing the above. Put forward the multi functional drilling frame development train of thought, and introduced the drilling frame work principle, structure characteristics and performance. Installation of the multifunctional drilling frame of crawler type roof bolter industrial test results show that, compared with the single pneumatic roof bolter, construction quality and working efficiency are obvious advantages, achieve the desired design requirements.
Based on SolidWorks to design and model three-dimensional jaw crusher
2012, 44(11):  126-127.  doi:
Abstract ( 774 )   PDF (950KB) ( 758 )  
References | Related Articles | Metrics
With jaw crusher for research object, with SolidWorks software as the 3D modeling platforms, established the 3D parts model of the fixed jaw and the moving jaw and the eccentric shaft and the flywheel and thrust board, etc, through the virtual assembly established the jaw crusher assembly body model, using interference function, effectively inspected the design flaw, and easy to adjust the design of the model, changed the traditional method of using 2D graphics to carry on the design, and reduced the requirements for the designer of the space imagination and the intensity of drawing, and enabled the designer can focus more on the design of the product, which is greatly raised the design level and design efficiency, which provides the effective reference for 3D design of crusher kind of mechanical products.
THE STATUS QUO AND APPLICATION PROSPECTS OF COAL MINE INFORMATION NETWORKING
2012, 44(11):  128-130.  doi:
Abstract ( 650 )   PDF (526KB) ( 619 )  
References | Related Articles | Metrics
This paper studies the status quo of coal mine information networking. The analysis indicates that although many information technologies have been widely used in coal mine industry such as remote monitoring, industrial Ethernet, mobile communication and coal mine management information system, some problems such as isolated information island, the lack of specialized software platform and the unbalance between hardware and software investigations still limit the rapid development of coal mine information networking. The paper also discusses the application prospects of information networking in coal mine, which is hoped to be somewhat a guideline for coal mine information networking construction.
A study and an implementation on the integrated system of coal mine safe haven
2012, 44(11):  131-133.  doi:
Abstract ( 455 )   PDF (505KB) ( 653 )  
Related Articles | Metrics
Abstract: According to the emergency management “perception-haven-rescue” three-stage model ,the function of the “six major system” of coal mine safe haven is synthetically analyzed; in accordance with the architecture and function of “six major system”, the architecture of the integrated system “six major system” is made based on GIS and its implementation is studied. The system has integrated coal mine geographic information data, coal mine real-time security information data, and “six major system” foundation information data. Furthermore, the system implemented the function of foundation data management of “six major system”, information management of security haven and emergency rescue work, the function of entity model entity property adjustable of “six major system” under three dimensional roadway environment, and the integrated monitoring and warning function of security monitoring information and personnel positioning information.
Brief Analysis on Several Key Links of Internal Control Risk Management System——Statement of Construction of Shenhua Zhungeer Energy Co., Ltd. Internal Control Risk Management System
2012, 44(11):  134-135.  doi:
Abstract ( 655 )   PDF (362KB) ( 791 )  
Related Articles | Metrics
Abstract: In building the internal control risk management system of enterprise, there are at least five elements, they are internal environment, risk evaluation, control activity, information and communication, internal supervision. Related to the reality of building internal control risk management system of Shenhua Zhungeer Energy Cp., Ltd., this writer focus on the analysis on the place and content of five links, which are “building and perfecting the system”, “carding and rebuilding the work flow”, “identifying and evaluating risk”, “formulating and carrying out the control measures”, “supervising and implementation testing of the system” .
The lowest bid in the application of construction project bidding Problems and Countermeasures
2012, 44(11):  136-137.  doi:
Abstract ( 433 )   PDF (402KB) ( 647 )  
References | Related Articles | Metrics
In this paper, the status of the lowest bid in the application of construction project bidding analysis, an objective that the scope of the problems of the lowest bid in conjunction with their work practices to address these issues in advance prequalification, the establishment of corporate integrity filereputation management system, a sound evaluation experts and training system to ensure the quality of the tender documents, set up bar price, improve the performance guarantee system of measures and countermeasure
The application of Behavior-based Safety in the Coal Mine Safety Management
2012, 44(11):  138-140.  doi:
Abstract ( 470 )   PDF (501KB) ( 767 )  
References | Related Articles | Metrics
Through statistical analysis of coal mine serious accidents in China recently, it is concluded that more than 90% of accidents in coal mine production are caused by unsafe behaviors of people. In order to effectively control the behavioral safety of employees, the concept of behavior-based safety (BBS) is established in coal mine safety management through behavior observations, ABC behavior analysis, behavior correction and other implementation processes. Based on behavior safety analysis, several coal mine safety management measures are further proposed, including strengthening safety education and training, attaching importance to behavior observation and information feedback, improving the assessment system and the incentive mechanism, building a good safety culture, and so on.