[1] 屠世浩,窦凤金.浅埋房柱采空区下近距离煤层综采顶板控制技术 [J].煤炭学报,2011,3:366—370.(strata control technology of the fully mechanized face in shallow coal seam close to the above room-and-pillar gob. [J].joural of china coal society. 2011,3:366—370.)
[2] 黄庆享.浅埋煤层的矿压特征与浅埋煤层的定义 [J].岩石力学与工程学报,2002,21(8):1174—1177.
HuangQingxiang.Groundpressurebehavioranddefinitionofshallow seams[J]. Chinese Joumal of Rock Mechanics and Engineeirng,2002,21(8): 1174—1177.
[3] 石平五,侯忠杰.神府浅埋煤层顶板破断运动规律[J].西安矿业学院学报,1996,16(3):204—207.(SHI Pingwu,HOU Zhongjie.Law of roof breaking movement of shallow seams in Shenfu CMA [J]. Journal of Xi'an Mining Institute,1996,l6 (3):204—207.(in Chinese)).
[4] 侯忠杰,吴文湘,肖 民.厚土层薄基岩浅埋煤层“支架一围岩”关系实验研究[J].湖南科技大学学报(自然科学版),2007,22(1):9-13.( HOU Zhongjie,WU Wen xiang,XIAO Min. Research on relation of“support and surrounding-rock”shallow seam covered with thick soil stratum and thin basic rock[J].Journal of Hunan University of Science and Technology (Natural Science),2007,22(1):9-13.(in Chinese).
[5] 钱鸣高,石平五.矿山压力与岩层控制[M].徐州:中国矿业大学出版社,2003.(QIAN Minggao,SHI Pingwu. Ground pressure and strata control [M]. Xuzhou: China University of Mining and Technology Press,2003.(in Chinese).
[6] 方新秋,郝宪杰,兰奕文.坚硬薄基岩浅埋煤层合理强制放顶距的确定[J].岩石力学与工程学报,2010,2(29). (FANG Xinqiu,HAO Xianjie,LAN Yiwen.Determination of reasonable forced caving interval in shallow-burled seam with hard and thin bedrook.Chinese journal of rock mechanics and engineering[J] 2010,2(29)).
[7] 于 富. 中深孔爆破强制放顶 [ J]. 煤炭技术,2008,27( 4): 88- 91.( YU Fu. Forced caving with middle deep-hole blasting[ J]. Coal Technology,2008,27( 4): 88- 91.
|