煤炭工程 ›› 2019, Vol. 51 ›› Issue (9): 56-61.doi: 10.11799/ce201909013

• 施工技术 • 上一篇    下一篇

软岩巷道联合支护技术研究

王洪闪,冉金林,李廷春,高启强,薛克龙   

  1. 山东科技大学
  • 收稿日期:2018-11-22 修回日期:2019-01-13 出版日期:2019-09-20 发布日期:2020-05-11
  • 通讯作者: 王洪闪 E-mail:1145883959@qq.com

Research on joint support technology of soft rock roadway

  • Received:2018-11-22 Revised:2019-01-13 Online:2019-09-20 Published:2020-05-11
  • Contact: shan HongWang E-mail:1145883959@qq.com

摘要: 针对西部地区煤矿围岩承载力低,锚喷支护难以有效控制围岩变形,巷道返修率居高不下等问题,在新上海一号煤矿113082轨道巷施工中,拟采用“钢带、锚杆索支护+反底拱”支护方案。基于围岩松动圈理论,确定了巷道松动圈的厚度及锚杆长度|基于关键部位支护原理,确定了锚索的长度、位置及排距|基于滑移线理论和塑性极限分析法,确定了反底拱锚杆的长度及间距。数值模拟结果表明,该方案能够改善围岩应力状态|现场实施后,该方案可以有效控制巷道围岩变形,保证了煤矿安全生产。

关键词: 软岩巷道, 联合支护, 松动圈, 关键部位支护, 反底拱, 数值模拟

Abstract: Due to the low bearing capacity of surrounding rock in coal mining roadway in western China, it is difficult to control the deformation of surrounding rock effectively by general bolting and spraying support. The common roadway sinking, bottom drum and film state phenomenon, the roadway repair rate remains high. The reason for the analysis is mainly the bolt isolation effect caused by the failure of the bolt to pass through the loose ring of the roadway and the stress concentration of the surrounding rock near the anchor. For this reason, based on the loose rock circle theory of the surrounding rock, the thickness of the loose ring of the roadway is calculated. According to the calculation of the bolt length; based on the key part support principle, the length, position and row spacing of the anchor cable are determined; the length and spacing of the counter-arch anchor are determined according to the slip line theory and plastic limit analysis method of the roadway floor. . In the construction of 113082 track mining roadway in No.1 Coal Mine of New Shanghai, the steel strip, anchor cable joint support and anti-bottom arch support scheme were designed. Numerical simulation shows that the scheme effectively improves the surrounding rock stress state and better control. The surrounding rock deformation of the roadway; after the implementation of the site, the continuous deformation of the roadway was controlled to ensure the safe production of the coal mine.