[1] |
王金华, 黄乐亭, 李首滨等.综采工作面智能化技术与装备的发展[J].煤炭学报, 2014, 39(08):1418-1423
|
[2] |
钱鸣高, 许家林, 王家臣.再论煤炭的科学开采[J].煤炭学报, 2018, 43(01):1-13
|
[3] |
Dongyan Chen, Kishor S,Trivedi.Optimization for condition-based maintenance with semi-Markov decision process[J].Reliability Engineering and System Safety, 2004, 90(1):25-29
|
[4] |
Kim-Anh Nguyen, Phuc Do, Antoine Grall.Joint predictive maintenance and inventory strategy for multi-component systems using Birnbaum’s structural importance[J].Reliability Engineering and System Safety, 2017, :-
|
[5] |
Hongfei H .A Multi-Objective Preventive Maintenance Decision-Making Model for Imperfect Repair Process[J].Journal of Shanghai Jiaotong University, 2018, :-
|
[6] |
Bo X U, Han X, Sun D, et al.System Condition-based Maintenance Scheduling Considering Opportunistic Maintenance[J].Proceedings of the Csee, 2015, 35(21):5418-5428
|
[7] |
郝虹斐, 郭伟, 桂林等.非完美维修情境下的预防性维修多目标决策模型[J].上海交通大学学报, 2018, 52(05):518-524
|
[8] |
甘婕, 曾建潮.考虑劣化状态的单机调度与维修决策集成模型[J].控制与决策, 2016, 31(03):513-520
|
[9] |
刘航, 李群湛, 郭锴.组合式同相供电装置维修决策建模及优化[J].西南交通大学学报, 2017, 52(02):355-362
|
[10] |
王国法, 王虹, 任怀伟等.智慧煤矿情景目标和发展路径[J].煤炭学报, 2018, 43(02):295-305
|
[11] |
王金华, 黄曾华.我国煤矿智能化采煤技术的最新发展[J].Engineering, 2017, 3(04):24-35
|
[12] |
于健浩, 祝凌甫, 徐刚.煤矿智能综采工作面安全高效开采适应性评价[J].煤炭科学技术, 2019, 47(03):60-65
|
[13] |
徐波, 韩学山, 孙宏斌等.一种适用于发电机组的机会维修模型[J].中国电机工程学报, 2018, 38(01):120-129
|
[14] |
王红, 杜维鑫, 刘志龙等.联合故障与经济相关性的动车组多部件系统维护[J].上海交通大学学报, 2016, 50(05):660-667
|
[15] |
徐孙庆, 耿俊豹, 魏曙寰等.考虑相关性的串联系统动态机会成组维修优化[J].系统工程与电子技术, 2018, 40(06):1411-1416
|