[1] |
冯玉军.事故频发凸显俄罗斯“去工业化”危机[J].世界知识,2019年17期.[2]于雷.综采工作面“三机”空间布置研究与应用[J].煤炭工程,2015,47(5):9~11. Yu Lei. Research and application on spatial arrangement of “three equipment matching”in fully-mechanized face[J].Coal Engineering , 2015,47(5):9~11.[3]马宝清.“一带一路” 战略视野下的煤炭开发投资国别研究[J].煤炭工程,2017,49(4):145~148. Ma baoqing. Study on coal investment strategies of different countries under the perspective of the Belt and Road[J].Coal Engineering,,2017,49(4):145~148.[4]刘亚军.梅利尼科瓦煤矿综采面设备选型与配套 [J].煤矿开采,2013,18(4):50~51.Liu yajun. Equipment selecting and matching of fully mechanized working face in Melnikova coal mine[J].Coal Mining Technology, 2013,18(4):50~51.[5]王国法,刘峰,孟祥军,等.煤矿智能化(初级阶段)研究与实践[J].煤炭科学技术,2019,47(8):1~36.WANG Guofa, LIU Feng, MENG Xiangjun, et al. Research and practice on intelligent coal mine construction(primary stage)[J].Coal Science and Technology, 2019, 47(8): 1~36.[6]韩会军,曾明胜,宋智鹰,等.8.2m大采高液压支架设计配套关键技术研究[J].煤炭科学技术,2017,45(11):63~68.HAN Huijun, ZENG Mingsheng, SONG Zhiying, et al. Research on key technology of powered support design in 8.2m large mining height face[J].Coal Science and Technology, 2017,45(11): 63~68.[7]王国法,刘峰,孟祥军,等.煤矿智能化(初级阶段)研究与实践[J].煤炭科学技术,2019,47(8):1~36.WANG Guofa, LIU Feng, MENG Xiangjun, et al. Research and practice on intelligent coal mine construction(primary stage)[J].Coal Science and Technology, 2019, 47(8): 1~36.[8]杨俊哲.8m大采高综采工作面关键回采技术研究[J].煤炭科学技术,2017,45(1):9~14.YANG Junzhe. Research on key mining technology of fully-mechanized working face with 8m large mining height[J]. Coal Science and Technology, 2017, 45(1): 9~14.[9]王国法,庞义辉,张传昌,等.超大采高智能化综采成套技术与装备研发及适应性研究[J].煤炭工程,2016,48(9):6~10.WANG Guofa, PANG Yihui, ZHANG Chuanchang , et al.Intelligent longwall mining technology and equipment and adaptability in super large mining height working face[J].Coal Engineering,2016,48(9):6~10.[10]姬刘亭.砂墩子矿井 4-1煤采煤方法与设备选型设计研究[J].煤炭工程,2019,51(8):5~8.JI Liuting. Study on Mining Method and Equipment Selection of 4-1 coal seam in Shadunzi Coal Mine[J]. Coal Mining Technology, 2019,51(8):5~8.[11]李明忠.大采高综放工作面交叉侧卸配套技术及应用[J].煤炭科学技术,2016,44(6):94~98.Li mingzhong. Cross side unloading matched technology and application to high cutting fully mechanized top coal caving mining face[J].Coal Science and Technology, 2016,44(6):94~98.[12]YU Lei, YAN Shao-hong, YU Hai-yong, ZHANG Zhen. Studying of dynamic bear characteristics and adaptability of support in top coal caving with great mining height [J]. Procedia Engineering, 2011, 26, 640~646.
|